Appendix D- Engineering Assessment
Earthworks Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: Sept 2020
Performance Outcomes Acceptable Outcomes Solution1 Comments Council Use
is avoided. RO5.1.
Managing contamination risk AO6.1 RO6.1
PO6 Fill material is solid clean earth, free of All fill imported to site will be free of
Materials used as fill are suitable for putrescible or refuse material, vegetation, contaminants.
development and future acid sulfate soils, building or construction
use of the land and filling or excavation material or other material or contaminants.
works do not result in
the contamination of land.
AO6.2
The site is not on the contaminated land
RO6.2
A search will be undertaken by
register. others to verify whether the
development fails on land listed on
the contaminated land register.
Haulage activity and amenity No acceptable outcome provided. RO7
PO7 Haul routes from trucks used to
Haulage of material to and from a site transport fill/spoil and material to
ensures— and from the site will only use major
(a) minimal disturbance to neighbouring road route to the site, haul trucks
properties and properties along the will use minor roads with the
haulage route; and shortest, most direct route that will
(b) Council’s road infrastructure including have the least amount of
pavements is not adversely affected. environmental impact. This will be
clearly documented in the
Construction Management Plan.
Extent of earthworks AO8 RO8
PO8 All earthworks, including cut and fill All earthworks will be contained
The layout of the development provides batters, retaining walls and the like are within the subject site. Any minor
adequate, clearly defined and easily contained within the subject site. earthworks undertaken external to
accessible— the site will only be undertaken
(a) on-site vehicle parking and after all approvals and/or consent is
manoeuvring areas; and obtained from Council and
(b) loading and manoeuvring areas for neighbouring property owners.
delivery and service vehicles.
Sloping sites AO9 RO9
PO9 Cut or fill is less than 1.5 metres in depth The proposal complies.
On sloping sites development follows the relative to the natural ground level.
natural landform wherever practical and
1
Solution: Acceptable Solution Page 3 of 5
A/S Alternative Solution D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\ESA\Working\Appendices\NSC Earthworks Code 2020.docx
N/A Not applicable to this proposal Job: 23098
Rev: 0
Site Address: 5 Pearl Street, Cooroy 22/09/2023
See the original