Water Supply and Sewerage Analysis
Table 6-5 Noosa on Weyba Proposed Pump Station Details
Local Tot~1 Pump Pump Rising .
Pump. Station Pump . .
Maximum
Station Service. Tota~ Capacity Head S!atlon m.am Velocity
Population Service EP Size Diameter
ID (PWWF _
(m) (m/s)
(EP) (kW) (mm)
LIs)
SPSNW1 679.65 679.65 7 14.59 1.56 100.00 0.90
SPSNW2 132.00 811.65 8 11.77 1.50 80.00 1.68
SPSNW3 409.20 1,220.85 13 35.81 6.87 100.00 1.62
SPSNW4 896.70 2,117.55 22 20.05 6.67 150.00 1.25
Should a low pressure sewer system be installed, smaller pump stations servicing individual lots would be
required. A single conventional pump station would still be required to discharge flow off the site to the
existing network.
To discharge to the existing pump station NVL011, the Noosa on Weyba pump station (SPSW14)would
need to discharge, via 400 metres of 150 mm diameter rising main, along Walter Hay Drive. As detailed in
Section 6.2.1, discharging the flow to NVL011 would require an upgrade of this pump station.
Figure 2 illustrates the proposed location of each pump proposed for the gravity option.
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 29.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.