~,.., Carclno                                                                                                  Noosa on Weyba
                                                                                             Water Supply and Sewerage Analysis




6.4              Noosa Heads Sewerage Treatment Plant

Flow from the Noosa on Weyba development is proposed to be conveyed and treated at the Noosa Sewage
Treatment Plant (STP). Based            on   advice from
                                                Unitywater officers and publically available documentation,
preliminary     investigations have indicated that the Noosa STP is at capacity.Augmentation to rectify the
capacity issues  at the Noosa  STP  has been  identified by the former Noosa   Shire  Council and has been
included in past Council budget minutes dating from 2008. Current advice from Unitywater has indicated that
the augmentation of the Noosa STP would be subject to review in 2012.

Analysis of the Noosa STP was detailed in a paper presented at the 2010 AWA Conference entitled, ’So Tell
Me Again, Why Do I Need To Upgrade An STP With 225 MIlD Capacity When It’s Only Treating 150 MIlD?"
M.Thomas, Unitywater. This paper highlighted that the capacity at the Noosa STP is primarily related to the
influent Biological Oxygen Demand (BOD)and COD (Chemical Oxygen Demand). COD and BOD represent
the relative strength of the influent sewage with levels of governing downstream treatment processes. This
could include the capacity of the bioreactors and clarifiers as well as the sludge processing stream. Table 6-6
below from the AWA conference paper compares the design capacity of the Noosa STP to the actual current

plant loadings.



Table 6-6       Noosa STP Design Capacity and Current Plant Loadings



 Design
            I   Current Loading (EP)


 Capacity                                            Total
                2009/10                                                  Total
 (EP)                       COD          BOD         Suspended                      Total Phosphorous
                Hydraulic                            Solids
                                                                         Nitrogen


 48,000         40,000      61,538       69,231      62,500              42,000     44,444




The table highlights that while the plant appears to be capable of treating the current hydraulic, Nitrogen and

Phosphorus loads, the current design capacity is not suitable to treat the BOD/COD and Suspended Solids
loads.

Advice was sought from            Unitywater regarding capacities and the potential for augmentation at the Noosa
STP. Unitywater, via Ashley Lorenz, provided the following advice:

      .   Noosa   Sewage Treatment Plant has capacity to serve existing sewer connections and new
          development designated in the current Noosa planning Scheme until late 2015. This assessment is
          based upon Unitywater’s assessment of the performance of the plant and certain assumptions
          about; rate of growth, influent characteristics and approval of new development not extending
          beyond the urban area detailed in the Noosa Planning Scheme as at June 2012.
      .   The Noosa Sewage Treatment Plant is operating beyond certain aspects of its design capacity but is

          producing effluent which complies with that prescribed in the environmental licence.
      .
          Unitywater is satisfied that the Noosa Sewage Treatment Plant is being operated very efficiently.
      .
          Unitywater and          the treatment   plant operator, Degr mont, have            commenced     preparation of a
          business case for augmentation of the Noosa Sewage Treatment Plant. Based upon the outcomes
          of an options analysis Unitywater’s Board has approved, in September 2012, a revised strategy for

          augmentation of the Noosa Sewage Treatment Plant which includes a delay in the preparation of the
          business case until such time as Unitywater obtains a new environmental licence. Unitywater will
          lodge a development application for augmentation of the treatment plant in January 2013 and is
          targeting a decision notice being issued in June 2013. It is expected that the augmentation will be
          commissioned in December 2015.



The full letter from Unitywater is detailed in Appendix C.



Northbrook Corporation Pty. LId                              Version 3                                       28 November 2012
5101-19                                             Commercial in Confidence                                           Page 18

Used in these records

About this file

File size
29.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12_0208.pdf · 29.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.