([D)MWH. Noosa on Weyba Water Network Performance Assessment
4 Network Performance
4.1 Maximum Hour Pressure Performance
Pressures for all options within the NIDMA water supply network remained above the required pressure
of 22 m with the inclusion of the proposed Noosa on Weyba development when assessed under
Ultimate maximum hour demands.
The maximum hour critical junction within the DMA was identified as NOON246 and is located
immediately upstream of the Noosaville West DMA inlet (Figure 4-1). Pressure at this location was
identified to reduce by 8 m with the inclusion of the proposed development during the Ultimate maximum
day planning horizon (Table 4-1).
LEGEND
Water Main
0
Junction
* Maximum Hour CPP
* fire flow cpp
* Proposed Development
Connections
D DMA
Figure 4-1: Network Performance Critical Pressure Locations
Status: Draft 22/06/2012
Project number: Page 4 Our ref: Noosa on Weyba WS Assessment.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 29.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.