Original source · versioned page text
Traffic Management Plan_IMS-04-05_D (001) FOR APPROVAL
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTraffic Management Plan All out of hours works will be subject to appropriate approvals from the relevant authorities. The relevant council is to provide written approval of the submitted this TMP and associated TGS’ prior to Shadforth mobilising to site. 2.6 Complaints Management A development information board will be provided at the site entry in a clear and appropriate location. This will provide the necessary contact details of the onsite manager. Complaints procedures will be handled as follows: Complaints directly to the Site Manager - Shadforth will maintain a complaints register that will record all public complaints made to them directly. The register will record dates, details and actions taken for future reference. The complainant will be notified by phone or email of the outcome. The Administrator may be notified of any complaints received and a copy of the register will be made available upon request. Complaints made to Noosa Council, Shadforth will work with the department to resolve the issues in a timely manner and appoint expert consultants to assist if necessary. E.g. Civil and Traffic Engineers. 2.7 Asset Management All road line markings and traffic signs within the vicinity of the site, will not be affected during the construction phase. There may be a need for temporary removal or modification to existing kerbs and landscaping for crossovers. Any changes, damage or deterioration of road pavement, kerbs, traffic signs and line markings that have occurred as a result of development works will be replaced and reinstated accordingly. Shadforth will ensure that pre and post records of the affected area will be recorded for future reference. It is noted during the pre- construction condition assessment of the existing infrastructure shows signs of fatigue and pavement failure / cracking throughout. IMS-04-05_D - Reviewed May 2019 Document Uncontrolled When Printed Page 13 of 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.