Original source · versioned page text
Traffic Management Plan_IMS-04-05_D (001) FOR APPROVAL
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTraffic Management Plan 3. Traffic Management Resources 3.1 Public and Worker Safety The key criteria at all stages of construction is to maintain a safe site, safe access to and from the site for workers, and to ensure the necessary safety measures and notifications are provided for the local community for the duration of works. Nearby Access Points Access to the works areas typically involve works on the side of the carriageways. Access to properties and any affected businesses is to be maintained at all times as agreed with the affected stakeholder. 3.2 Traffic Guidance Scheme Summary It should be noted that this TMP has been developed on the basis that all activities associated with this project will be undertaken within the approved areas of the project. The traffic management devices will be in place as required by the TGS and scope of works. This will be prior to commencement of activities on site. For reference to site wide traffic management TGS, refer to the Appendix of this document. IMS-04-05_D - Reviewed May 2019 Document Uncontrolled When Printed Page 14 of 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.