9. Traffic Management Implementation
9.1 Existing Conditions and Operations
Refer to Section 1.5 for project personnel details.
9.2 Implementation Details
▪ All TGS implementations are subject to the Risk Assessment process and requirements
▪ All TGS must be implemented as per the “Optimal Treatment” set out in the MUTCD, with modifications to
“Optimal Treatments” restricted as per Clause 4.1.6 - Tolerances and Positioning, unless Risk Assessed
and signed off by a RPEQ.
▪ QLD MUTCD Work on Roads 9th Edition. “Optimal Treatment” requirements are:
o Risk Management as per Clause 2.2.3
o Variation to Optimal Treatment as per Clause2.2.5
o Long Term signage as per Clause 2.5.2
o Short Term signage as per Clause 3.3 and Appendix D
o Traffic Cone and Bollard spacing as per Table 3.7
o Temporary RRPM use as per Clause 3.9.4 and 3.9.5
o Safety Buffer as per Clause 4.1.4(c)
o Value of “D” as per Table 4.2
o Tolerances and Positioning as per Clause 4.1.6
o Static work sites as per Clause 4.2
o Mobile works as per clause 4.6 and Table 4.5
o Advance Warning Signage as per Clause 4.7
o Taper lengths as per Table 4.6 and Clause 4.8
o Speed zones as per Table 4.7 and Clause 4.9
o Reversible Flow (single lane lengths) as per Table 4.9, Clause 4.13.1 (previously TRUM Note 7.9)
o Number of lanes as per Table 4.10 and Clause 4.13.2
o Minimum lane widths as per Table 4.11, Clause 4.13.3 & 4.13.4
o Local Traffic Access as per Clause 4.14.5
o Reversed traffic direction considerations as per Clause 4.14.8
o Roadwork at Intersections as per MUTCD - Appendix F
o Emergency and Unplanned works as per MUTCD - Appendix H
▪ Traffic Delays guidelines to be within Project Annexure MRTS02.1: No greater than 5mins.in low traffic
volume times. Nil in high flow volumes
▪ Traffic Controllers to be positioned according to TCASAP and MUTCD requirements.
▪ Worker and Flagman Symbolics to be covered when workers / Traffic Controllers not working or not visible
to traffic
IMS-04-05_D - Reviewed May 2019 Document Uncontrolled When Printed Page 19 of 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.