ORDINARY MEETING AGENDA 18 AUGUST 2022
33. It is a requirement of the ‘Plumbing and Drainage Regulation 2019’ that at demolition of
a building classed 1-10, the existing sanitary drain upstream from the connection point
for a service provider’s sewerage system must be sealed water tight. This work is
deemed as Notifiable Work and must be carried out by a suitably licenced plumber who
shall submit an As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC
(Queensland Building Construction Commission) within 10 days of completing the work.
Special conditions relating to the redevelopment of Unit 19 only – 4 March 2021
34. The Level 1 balcony is to be setback 0.5 metres from the western boundary and 3.5
metres from the northern boundary.
35. All parts of the building must be wholly contained within Lot 19 with the exception of
structures in the exclusive use area as stipulated by the Community Management
Statement for the site.
36. The storage room on the ground level is not to be used as a bedroom or as any other
habitable room.
Additional Conditions specific for Lot 30 (and the use of Lots 7 & 11 for
construction and access) – 21 October 2021
Performance Bond - Planning
37. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
must be submitted to Council, to secure performance of all conditions of this approval,
specifically for Lot 30, prior to the issue of a Development Permit for Building Works. The
cash bond or trading bank guarantee will be returned on performance of the conditions
of approval less any costs incurred by Council in respect of enforcing performance of
this permit. Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with conditions.
Performance Bond – Demolition
38. Security to the value of $10,000 must be provided to Council’s Building and Plumbing
Services prior to the issue of the development approval for building works (demolition).
The security must be in the form of a cash bond or bank guarantee, for security against
satisfactory completion of works.
Landscaping
39. The development site must be landscaped generally in accordance with the approved
plans and Planning Scheme Policy PSP2 – Landscaping, and the following
requirements:
a. A minimum of a 1m wide garden with dense landscaping must be provided to the
north, south and western boundaries within Lot 30.
b. The 1m wide garden must consist of 45 litre pot size native trees planted at 1.5m
centres. Include 1 x 100 litre pot size tree to be planted in each of the following
locations:
i. south east corner; and
ii. half way along the southern boundary; and
iii. to the west of the visitor car space where the lot dog legs.
c. The plantings must grow to an average minimum height of 10m and be suitable
native species for the urban surroundings such as Syzygium, Elaeocarpus,
Acronychia.
d. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed
to grow to full form and be refurbished when its life expectancy is reached.
Page 14 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.