GENERAL COMMITTEE MEETING AGENDA 12 DECEMBER 2016
Financial incentives are available to the contractor if they negotiate improvements in the
marketing of recovered material. (This is intended to facilitate the movement of surplus
stockpiles of recycled material at the resource recovery facility).
Agreement has been negotiated for the contractor to work with Council to develop two new
retail products, blended soil and Australian Standard compost, for sale to the public. The
revenue returned from sales will be used to offset the costs of production with surplus
revenue shared between Council and contractor.
Previous Council Consideration
Nil.
Finance & Risk
The waste management contract has historically been let for a 7 year period together with
optional extensions, often taking the contract period to 10 years. It is the largest contract entered
into by the Council, and as such presents a number of significant risks to Council, which are
summarised below:
Portion A Collections
Ensuring the implementation of the 3 bin service does not result in anticompetitive behaviour.
Failure to pay the Security Bond.
Financial failure of the contractor resulting in serious disruption to an essential waste
collection service in the community.
If a non performing contractor is engaged the impact on Council can be significant with
respect to damage to both reputation and also established relationships with the community.
Portion B Landfill
An underperforming contractor on the landfill and resource recovery facility can expose
Council to significant penalties under environmental legislation.
As holder of the Environmental Authority (Licence) with EPA, Council is exposed to significant
financial risks for breach of conditions and harm to its environmental credentials.
Poor operational performance on the landfill (under compaction of waste) also results in
consumption of valuable landfill air space, reducing the life of the landfill.
Portion C
The objectives of Council’s Waste Reduction and Waste Minimisation Plan 2016-2024”
cannot be achieved.
The range of materials recycled is not able to be sold as markets are not available.
Performance Bond Held to Reduce Risk
The contract provides for Council to hold a substantial performance bond on each of the
separable portions.
For Separable Portion A - $1,000,000;
For Separable Portion B - $750,000; and
For Separable Portion C - $200,000.
This bond is available to Council if the contractor defaults on the provision of services. If all or
any portion of the bond is used during the term the Contractor is required to immediately replace
the amount used to maintain the available bond as detailed above.
Page 53 of 81
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.