Original source · versioned page text
16216_Parking & Traffic Impact Assessment Report_1502017
Attached to the e-mail Planning report, Traffic impacts, Landscape plans MCU17/0014.
Proposed Mixed Use Development, 30-32 Doonella Road, Tewantin
Parking & Traffic Impact Assessment Report
Appendices
Appendix A Swept Path analysis
Appendix B Development Plans
Tables
Table 2-1 Road Classifications 4
Table 2-2 Bus Services 5
Table 3-1 Minimum car parking requirements (Table 14-51 from The Noosa Plan) 9
Table 3-2 Proposed Car Parking Supply 10
Table 3-3 Car Parking Dimensions 10
Table 3-4 Bicycle Parking requirements 12
Table 4-1 Peak Hour Development Traffic Generation 14
Table 4-2 Peak Hour Existing Traffic Generation 14
Table 4-3 Projected Nett Increase in Peak Hour Traffic Generation Potential 15
Table 4-4 Peak Hour Traffic Count observed on 16 December 2016 15
Figures
Figure 2-1 Subject Site Area 2
Figure 2-2 Land Use Map 3
Figure 2-3 Road Network Layout 4
Figure 2-4 Bus Services Map 6
Figure 2-5 Noosa Shire Council Public Transport Infrastructure Map 6
Figure 2-6 Public Off-street Car Parking Restrictions 8
Figure 3-1 Waste Management plan 13
Figure 3-2 Garbage Truck route (swept path) 13
Figure 4-1 Traffic Assignment (both AM and PM peak hours) 16
Figure 5-1 Development Traffic Impact (AM peak hour) 17
Figure 5-2 DTMR Road Planning & Design Manual (2nd Ed) Turn treatment warrants (NDD) 19
Figure 5-3 DTMR Road Planning & Design Manual (2nd Ed) Turn treatment warrants (EDD) 19
Figure 5-4 Austroads Guide to Road Design Part 4A – AUL(s) turn treatment layout 20
Figure 5-5 AUL(s) turn treatment layout for entry driveway 21
12 February 2017 Greys iv
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (16216_Parking & Traffic Impact Assessment Report_1502017.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.