Original source · versioned page text
16216_Parking & Traffic Impact Assessment Report_1502017
Attached to the e-mail Planning report, Traffic impacts, Landscape plans MCU17/0014.
Proposed Mixed Use Development, 30-32 Doonella Road, Tewantin
Parking & Traffic Impact Assessment Report
1 Introduction
1.1 Background
Greys Consulting has been engaged by Doonella Street Pty Ltd to prepare a Traffic Impact Assessment
(TIA) to support the development application for a proposed mixed-use development located at 30-32
Doonella Road, Tewantin.
The plans for the proposed development, which were assessed for this Traffic Impact Assessment report,
are listed below, and are appended to the report.
The basement car park layout (SD02) has been revised on 3 February 2017 to incorporate comments from
the draft report.
1.2 Reference Documents
The following documents have been reviewed and referenced in this report:
> The Noosa Plan 2006;
> Guidelines for Assessment of Road Impacts of Developments (DTMR, 2006)
> Guide to Traffic Generating Developments (RTA, 2002);
> Guide to Traffic Generating Developments – Updated traffic surveys (RMS, TDT 2013/04a); and
> AS_NZS2890.1-2004 Parking Facilities-Off Street Car Parking.
12 February 2017 Greys 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (16216_Parking & Traffic Impact Assessment Report_1502017.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.