STORMWATER QUALITY MANAGEMENT PLAN CJ > Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

 

2.3 Stormwater Runoff from Site Catchments
Stormwater from the site runoff will be controlled as follows:

> “Clean” roof runoff will be harvested by draining to on-site storage for re-use;
> Paved carparking and hardstand areas will drain to a gross pollutant trap and for
treatment prior to discharging off the site.

The buildings will be provided with duplicate runoff collection plumbing, where required, to
separate ‘clean’ roof runoff and paved area runoff.

2.4 Re-use of Stored Non-Potable Water

Stored non-potable roof water runoff will be re-used for the following:

¢ Irrigation watering of garden areas;

e Toilet Flushing.

2.5 Water Re-use Criteria

The water re-use criteria for the site aim to comply with the SCRC requirements enabling
the benefits from Sections 5.10, 5.11 and 5.13 of the Queensland Water Recycling Strategy
(QWRS) (EPA, 2001) to be achieved. Based on this, the criteria used to determine water
re-use included the following:

e ‘Fit for purpose’ uses
e Source substitution

e Wastewater minimisation

2.5.1 Roof Catchment Areas

The ‘clean’ roof catchment area was determined to total 590m’.

2.5.2 Storage Tanks

The storage tanks have been sized in accordance with the conditions of the development
approval and Table 2 of the SCRC Integrated Water Management Guidelines. Using the
15Um? of roof area, the storage requirement for the site is equal to 8,850L. It is proposed
to use an18,000 L precast concrete underground tank with a structural slab over.

 

Comiskey Group Page 2 18 June 2008

236401 ML Stormwater Quality Report.doc Commercial in Confidence Version 1

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.