Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
STORMWATER QUALITY MANAGEMENT PLAN CJ > Cardno PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH 2.3 Stormwater Runoff from Site Catchments Stormwater from the site runoff will be controlled as follows: > “Clean” roof runoff will be harvested by draining to on-site storage for re-use; > Paved carparking and hardstand areas will drain to a gross pollutant trap and for treatment prior to discharging off the site. The buildings will be provided with duplicate runoff collection plumbing, where required, to separate ‘clean’ roof runoff and paved area runoff. 2.4 Re-use of Stored Non-Potable Water Stored non-potable roof water runoff will be re-used for the following: ¢ Irrigation watering of garden areas; e Toilet Flushing. 2.5 Water Re-use Criteria The water re-use criteria for the site aim to comply with the SCRC requirements enabling the benefits from Sections 5.10, 5.11 and 5.13 of the Queensland Water Recycling Strategy (QWRS) (EPA, 2001) to be achieved. Based on this, the criteria used to determine water re-use included the following: e ‘Fit for purpose’ uses e Source substitution e Wastewater minimisation 2.5.1 Roof Catchment Areas The ‘clean’ roof catchment area was determined to total 590m’. 2.5.2 Storage Tanks The storage tanks have been sized in accordance with the conditions of the development approval and Table 2 of the SCRC Integrated Water Management Guidelines. Using the 15Um? of roof area, the storage requirement for the site is equal to 8,850L. It is proposed to use an18,000 L precast concrete underground tank with a structural slab over. Comiskey Group Page 2 18 June 2008 236401 ML Stormwater Quality Report.doc Commercial in Confidence Version 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.