Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056

of 73

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

STORMWATER QUALITY MANAGEMENT PLAN Cc > Cardna

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

 

3. STORMWATER QUALITY

3.1 Water Quality Management Concept

The aim of the water quality management system for the proposed development is to
protect and enhance natural water systems within urban developments in accordance with
the policies of SCRC.

3.2 Receiving Waters

Stormwater runoff from the overall site discharges into the existing drainage system along
David Low Way on the north western boundary of the site. This drainage connects to a
drainage system that eventually flows to Girraween Reserve.

3.3 Stormwater Quality Control & Treatment

Stormwater quality will be controlled by treatment through the use of two “Clearmake” gross
pollutant traps (or equivalent) located in the carpark area prior to discharging into the
existing on-site drainage system.

3.4 Management of Water Quality during Construction Phase

During the construction phase, the potential exists for significant increases in the amount of
pollutants, particularly sediment, exported from the site. During this period, an Erosion and
Sediment Control Plan will be implemented as part of the overall Environmental
Management Plan prepared for the construction phase.

Erosion and sediment control measures will be implemented in accordance with Council
requirements and the recommendations of “Soif Erosion and Sediment Control,
Engineering Guidelines for Queensland Construction Sites” by the Institution of Engineers
Australia, 1996.

3.5 Conclusions

The inclusion of rainwater harvesting, gross pollutant traps and stormwater detention within
the proposed development on Lot 31 on RP149005 at 71 Pacific Avenue, Sunshine Beach
will minimise the impact of the development with respect to stormwater quality.

4. DISCHARGE TO EXISTING DRAINAGE SYSTEM

4.1 Stormwater Detention

In accordance with the Council's conditions of approval “The maximum discharge of
stormwater drainage allowable ...... at any one location is 25litres/second.” Reduced runoff
and peak flows from the development by local detention measures is necessary. It is
proposed that a portion of the proposed 18,000 litre storage tank is used to attenuate the
stormwater discharge from the site.

 

Comiskey Group Page 3 18 June 2008

238401 ML Stormwater Quality Report.doc. Commercial in Confidence Version 1

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.