08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
STORMWATER QUALITY MANAGEMENT PLAN Cc > Cardna PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH 3. STORMWATER QUALITY 3.1 Water Quality Management Concept The aim of the water quality management system for the proposed development is to protect and enhance natural water systems within urban developments in accordance with the policies of SCRC. 3.2 Receiving Waters Stormwater runoff from the overall site discharges into the existing drainage system along David Low Way on the north western boundary of the site. This drainage connects to a drainage system that eventually flows to Girraween Reserve. 3.3 Stormwater Quality Control & Treatment Stormwater quality will be controlled by treatment through the use of two “Clearmake” gross pollutant traps (or equivalent) located in the carpark area prior to discharging into the existing on-site drainage system. 3.4 Management of Water Quality during Construction Phase During the construction phase, the potential exists for significant increases in the amount of pollutants, particularly sediment, exported from the site. During this period, an Erosion and Sediment Control Plan will be implemented as part of the overall Environmental Management Plan prepared for the construction phase. Erosion and sediment control measures will be implemented in accordance with Council requirements and the recommendations of “Soif Erosion and Sediment Control, Engineering Guidelines for Queensland Construction Sites” by the Institution of Engineers Australia, 1996. 3.5 Conclusions The inclusion of rainwater harvesting, gross pollutant traps and stormwater detention within the proposed development on Lot 31 on RP149005 at 71 Pacific Avenue, Sunshine Beach will minimise the impact of the development with respect to stormwater quality. 4. DISCHARGE TO EXISTING DRAINAGE SYSTEM 4.1 Stormwater Detention In accordance with the Council's conditions of approval “The maximum discharge of stormwater drainage allowable ...... at any one location is 25litres/second.” Reduced runoff and peak flows from the development by local detention measures is necessary. It is proposed that a portion of the proposed 18,000 litre storage tank is used to attenuate the stormwater discharge from the site. Comiskey Group Page 3 18 June 2008 238401 ML Stormwater Quality Report.doc. Commercial in Confidence Version 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.