STORMWATER QUALITY MANAGEMENT PLAN Cc ) Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

 

4.2 Discharge to existing system

To facilitate the carparking and hardstand area to be treated by the proposed GPT's the
carpark has been designed to drain towards the southwest corner

The proposed 100 year ARI discharges calculated using the rational method would be.

Pre-Development

Internal Catchment

Area = 0.1614Ha

Fraction Impervious = 0.4
C100 = 0.94

Time of Concentration = 5 mins
Rainfall Intensity = 319 mm/h
Q100 = 0.1344 m/s

Post-Development

Internal Catchment

Area = 0.1614Ha

Fraction Impervious = 0.85
C100 = 1.0

Time of Concentration = 5 mins
Rainfall Intensity = 319 mm/h
Q100 = 0.143 m¥/s

Total increase in Peak Flow
Q100 = 0.0086 m*/s

4.3 Assessment of Detention Storage

In order to assess the effectiveness of the storage volume an XPSWMM model was
developed. The model input parameters were as follows:

e Rainfall patterns as per Australian Rainfall & Runoff 1987;
Initial losses of Omm for pervious and impervious catchment areas;
e Continuing losses of 2.5mm/hour for the pervious catchments and Omm/hr for the
impervious catchment areas;
Hydrologic method — Laurenson’s Method; and
Hydrographs were routed using the Hydraulic Layer within XPSWMM.

As noted previously it is proposed that an 18,000L rainwater tank be utilised for harvesting
and to provide detention storage within the site. The storage volume incorporated within
the XPSWMM model was approximately 9,150L. The rainwater tank is being designed to
accept runoff from the entire roof area within the site, which is the dominant increase in
impervious area.

The inclusion of the above storage volume within the XPSWMM model provided significant
attenuation to the roof catchment area, but was unable to reduce the peak discharge via
the minor drainage system to less than 25L/s or demonstrate non-worsening of the total
site discharges. In order to reduce the discharge from the minor drainage system it was
identified that additional storage was required in-line with the internal pipework to comply
with the key criteria for the site.

 

Comiskey Group Page 4 18 June 2008

238401 ML Stormwater Quatity Report.doc Commercial in Confidence Version 1

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.