STORMWATER QUALITY MANAGEMENT PLAN Cc ) Cardno PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH 4.2 Discharge to existing system To facilitate the carparking and hardstand area to be treated by the proposed GPT's the carpark has been designed to drain towards the southwest corner The proposed 100 year ARI discharges calculated using the rational method would be. Pre-Development Internal Catchment Area = 0.1614Ha Fraction Impervious = 0.4 C100 = 0.94 Time of Concentration = 5 mins Rainfall Intensity = 319 mm/h Q100 = 0.1344 m/s Post-Development Internal Catchment Area = 0.1614Ha Fraction Impervious = 0.85 C100 = 1.0 Time of Concentration = 5 mins Rainfall Intensity = 319 mm/h Q100 = 0.143 m¥/s Total increase in Peak Flow Q100 = 0.0086 m*/s 4.3 Assessment of Detention Storage In order to assess the effectiveness of the storage volume an XPSWMM model was developed. The model input parameters were as follows: e Rainfall patterns as per Australian Rainfall & Runoff 1987; Initial losses of Omm for pervious and impervious catchment areas; e Continuing losses of 2.5mm/hour for the pervious catchments and Omm/hr for the impervious catchment areas; Hydrologic method — Laurenson’s Method; and Hydrographs were routed using the Hydraulic Layer within XPSWMM. As noted previously it is proposed that an 18,000L rainwater tank be utilised for harvesting and to provide detention storage within the site. The storage volume incorporated within the XPSWMM model was approximately 9,150L. The rainwater tank is being designed to accept runoff from the entire roof area within the site, which is the dominant increase in impervious area. The inclusion of the above storage volume within the XPSWMM model provided significant attenuation to the roof catchment area, but was unable to reduce the peak discharge via the minor drainage system to less than 25L/s or demonstrate non-worsening of the total site discharges. In order to reduce the discharge from the minor drainage system it was identified that additional storage was required in-line with the internal pipework to comply with the key criteria for the site. Comiskey Group Page 4 18 June 2008 238401 ML Stormwater Quatity Report.doc Commercial in Confidence Version 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.