Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056

of 73

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

STORMWATER QUALITY MANAGEMENT PLAN
PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

Cc Cardno

 

Due to the constraints from both limited cover and existing invert levels to the external
drainage infrastructure it was determined that the storage could be achieved through the
use of oversized stormwater pipes. Based on the XPSWMM analysis it was identified that
30m of 525mm diameter stormwater pipe, controlled by a 225mm diameter outlet, would
attenuate the site discharges to 25L/s during the major event (100 year ARI). In addition,
the storage reduces the combined discharges from the site to less than the existing

discharges from the site.

The following table summarises the peak discharges obtained for the existing and
developed (mitigated) scenarios.

Table 1 Summary of Peak Discharges for the 10 and 100 Year ARI

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Average Storm Duration Existing Discharge Developed
Recurrence (mins) (m/s) (Mitigated)
Interval (Years) Discharge (m*/s)
10 10 0.070 0.028
10 15 0.089 0.030
10 20 0.088 0.034
10 25 0.082 0.032
10 30 0.086 0.037
10 45 0.076 0.033
10 60 0.080 0.040
10 120 0.065 0.036
10 180 0.047 0.033
100 10 0.106 0.043
100 15 0.129 0.046
100 20 0.126 0.050
100 25 0.127 0.052
100 30 0.120 0.051
100 45 0.110 0.048
100 60 0.114 0.053
100 120 0.086 0.047
100 180 0.065 0.044
The following figures depict the results included in Table 1.
Comiskey Group Page 5 18 June 2008
238401 ML Stormwater Quality Report.doc Commercial in Confidence Version 1

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.