Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
STORMWATER QUALITY MANAGEMENT PLAN PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH Cardno Gq Conduit Link3 from Existing to Node4 eel — —— = ee 10 [Max 0.070] 15 [Max 0.089] 20 [Max 0.088] 25 [Max 0.082] 30 [Max 0.086] —_ — — — 45 [Max 0.076] 60 [Max 0.080] 120 [Max 0.065] 180 [Max 0.047] 0.09 0.08 0.07 0.06 0.05 é i 0.04 0.03 0.02 0.01 0.00 1 Sun 1AM 2AM 3AM Jan 2006 Time Figure 1 10 Year ARI Existing Results Conduit Link4 from NodeS to Outlet eau — a ait “oe 4 10 [Max 0.028} 15 [Max 0.030] 20 [Max 0.034] 25 [Max 0.032] 30 [Max 0.037] — — — eee 45 [Max 0.033] 60 [Max 0.040] 120 [Max 0.036] 180 [Max 0.033] 0.040 0.035 : 0.030 0.025 é it 0.020 0.015 _ 0.010 ~ 0.005 0.000 ~ — 1 Sun 1AM 2AM 3AM Jan 2006 Time Figure 2 10 Year ARI Developed (Mitigated) Results Comiskey Group Page 6 238401 ML Stormwater Quality Report. doc Commercial in Confidence 18 June 2008 Version 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.