Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ENVIRONMENTAL MANAGEMENT PLAN Cc > Cardno PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH It should be noted that the Environmental Protection Act places a duty on any person undertaking any activity to report any incidences that may cause environmental harm. 1.3 Corrective Action The Contractor is required to complete corrective action request (CAR) forms, a sample of which is included in Appendix A. The Contractor is also required to maintain a register of CARs, which shall demonstrate that all required remediation measures have been completed. Copies of CARs shall be provided to Council upon request. In some instances, further investigation or monitoring may be required to establish whether the Contractor has failed to adequately implement the EMP, or has failed to comply with relevant legislation, guidelines and statutes. For example, monitoring may be required for bulk air sampling, or noise emitted from site activities as the result of a dispute with a neighbouring party. In these instances, an independent party such as the Consultant shall carry out the investigation or monitoring. If it is established that the cause for complaint has arisen from the Contractors actions or omissions, then the costs of the monitoring shall be deducted from payments to the Contractor and paid to the Consultant, otherwise the costs of the monitoring shall be obtained from the Superintendent and paid to the Consultant. 1.4 Management of the Site The following personnel can be contacted regarding the management of the site during both construction & operational stages. ° Developer: Comiskey Group Contact Person: Rob Comiskey Contact Ph No.: 38822533 ° Consulting Engineer: Cardno (QId) Pty Ltd Contact Person: Mike Laverty Contact Ph No.: 5443 2555 ° Contractor: To be Advised Contact Person: Contact Ph No.: e Local Authority: Sunshine Coast Regional Council: Contact Person: TBA Contact Ph No.: TBA ° Government Agencies: EPA Contact Person: TBA Contact Ph No.: TBA Comiskey Group 2 18 June 2008 Environmental Management Plan Rev: 1 238401
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.