ENVIRONMENTAL MANAGEMENT PLAN Cc > Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

It should be noted that the Environmental Protection Act places a duty on any person
undertaking any activity to report any incidences that may cause environmental harm.

1.3 Corrective Action

The Contractor is required to complete corrective action request (CAR) forms, a sample of
which is included in Appendix A. The Contractor is also required to maintain a register of
CARs, which shall demonstrate that all required remediation measures have been
completed. Copies of CARs shall be provided to Council upon request.

In some instances, further investigation or monitoring may be required to establish whether
the Contractor has failed to adequately implement the EMP, or has failed to comply with
relevant legislation, guidelines and statutes. For example, monitoring may be required for
bulk air sampling, or noise emitted from site activities as the result of a dispute with a
neighbouring party. In these instances, an independent party such as the Consultant shall
carry out the investigation or monitoring. If it is established that the cause for complaint has
arisen from the Contractors actions or omissions, then the costs of the monitoring shall be
deducted from payments to the Contractor and paid to the Consultant, otherwise the costs
of the monitoring shall be obtained from the Superintendent and paid to the Consultant.

1.4 Management of the Site

The following personnel can be contacted regarding the management of the site during
both construction & operational stages.

° Developer: Comiskey Group
Contact Person: Rob Comiskey
Contact Ph No.: 38822533

° Consulting Engineer: Cardno (QId) Pty Ltd
Contact Person: Mike Laverty
Contact Ph No.: 5443 2555

° Contractor: To be Advised

Contact Person:
Contact Ph No.:

e Local Authority: Sunshine Coast Regional Council:
Contact Person: TBA
Contact Ph No.: TBA

° Government Agencies: EPA

Contact Person: TBA
Contact Ph No.: TBA

 

Comiskey Group 2 18 June 2008
Environmental Management Plan Rev: 1 238401

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.