ENVIRONMENTAL MANAGEMENT PLAN Cc » Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

2. SITE FACTORS

2.1 General Description

The site is located at 71 Pacific Avenue, Sunshine Beach. The proposal consists of
Childcare Centre and associated infrastructure. The site has an area of approximately
1614m2 which consists of land that is gently sloping to the west from RL52.8 to RL55.2.
The site has two road frontages with an existing drainage system into which all
stormwater will be discharged.

2.2 Engineering Constraints

There is an existing sewer main through the rear of the block that requires a 3.0m
easement. The existing drainage inlet on the northwest frontage of the site is the only
suitable outlet for stormwater discharge via direct connection.

3. METHODS

3.1. Construction

A site based management plan will be developed by the nominated contractor to
incorporate practical approaches and site experience into minimizing site impacts. Staging
plans will be developed to minimize the extents of exposed areas at any time and ensure
that all external flows are diverted from areas of works. The resources, plant and timing
proposed by the contractor will be the basis of the documentation of procedures, in
accordance with the ESCP Guidelines (iEAust, 1996).

3.2. Monitoring

All site monitoring shall be conducted in accordance with the elements outlined in this EMP.
Any recommendations outlined in the accompanying reports shall be incorporated into the
Site Based Management Plan prepared by the Contractor and approved by Cardno prior to
works commencing on site. Any discrepancies shall be brought to the attention of the
engineer during the development of the SBMP.

 

Comiskey Group 3 18 June 2008
Environmental Management Plan Rev: 1 238401

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.