ENVIRONMENTAL MANAGEMENT PLAN Cc > Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

ELEMENT C1 — SITE CONTROL AND WASTE MANAGEMENT PLAN

POLICY: To maintain construction compounds in a neat and tidy state without build up
of litter and to provide a safe facility for the storage of construction equipment
and materials.

PERFORMANCE The site shall be maintained in a safe and tidy condition. Waste materials
OBJECTIVES: generated on site shall be stored in safe temporary storage prior to final
disposal. All relevant Council by-laws shall be complied with.

CONTROL Within the site, the Contractor shall establish a Litter and Waste Control Plan,
MEASURES: to manage the collection, storage and removal of all litter and waste on the
site, whatsoever its origin.

All litter and waste, including pre-existing materials, construction wastes,
human waste, used oils and any other surplus materials shall not be disposed
of on site. Material shall not be burnt or buried on site. All such materials shall
be collected as they are accumulated, using appropriate methods to enable
their future removal from the site and disposal. All such materials shall be
stored on site in approved secure confined area(s).

Specific areas shall be set aside for the storage of construction materials. In
particular, a safe storage location for fuels and oils shall be provided in
accordance with AS 1940 “The Storage and Handling of Combustible Liquids”.
This area shall be bunded in compliance with the standard.

MONITORING: The Contractor shall monitor the construction and record details of work areas,
fencing, storage locations and access roads.

Weekly inspections of the site by the Contractor to verify locations and storage
of litter and waste on the site.

REPORTING: Records of removal of oils, litter and waste should be kept for later referral if
necessary. The responsibility for creating and maintaining this database shall
be borne by the Contractors, Site Foreman. Records shall be provided to
Council upon request.

CORRECTIVE Non-conformance with this plan shall be documented by the Contractor and a

ACTION: corrective action request (CAR) issued. All CARs shall be included in the Non-
conformance Register which will be developed and maintained by the
Contractor. CARs shall be provided to Council upon request.

The Contractor shall implement the corrective action as required within the
agreed time frame noted on the CAR.

The Contractor shall advise the Superintendent upon completion of the
corrective action.

 

Comiskey Group 4 18 June 2008
Environmental Management Plan Rev: 1 238401

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.