Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ENVIRONMENTAL MANAGEMENT PLAN Cc > Cardno PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH ELEMENT C1 — SITE CONTROL AND WASTE MANAGEMENT PLAN POLICY: To maintain construction compounds in a neat and tidy state without build up of litter and to provide a safe facility for the storage of construction equipment and materials. PERFORMANCE The site shall be maintained in a safe and tidy condition. Waste materials OBJECTIVES: generated on site shall be stored in safe temporary storage prior to final disposal. All relevant Council by-laws shall be complied with. CONTROL Within the site, the Contractor shall establish a Litter and Waste Control Plan, MEASURES: to manage the collection, storage and removal of all litter and waste on the site, whatsoever its origin. All litter and waste, including pre-existing materials, construction wastes, human waste, used oils and any other surplus materials shall not be disposed of on site. Material shall not be burnt or buried on site. All such materials shall be collected as they are accumulated, using appropriate methods to enable their future removal from the site and disposal. All such materials shall be stored on site in approved secure confined area(s). Specific areas shall be set aside for the storage of construction materials. In particular, a safe storage location for fuels and oils shall be provided in accordance with AS 1940 “The Storage and Handling of Combustible Liquids”. This area shall be bunded in compliance with the standard. MONITORING: The Contractor shall monitor the construction and record details of work areas, fencing, storage locations and access roads. Weekly inspections of the site by the Contractor to verify locations and storage of litter and waste on the site. REPORTING: Records of removal of oils, litter and waste should be kept for later referral if necessary. The responsibility for creating and maintaining this database shall be borne by the Contractors, Site Foreman. Records shall be provided to Council upon request. CORRECTIVE Non-conformance with this plan shall be documented by the Contractor and a ACTION: corrective action request (CAR) issued. All CARs shall be included in the Non- conformance Register which will be developed and maintained by the Contractor. CARs shall be provided to Council upon request. The Contractor shall implement the corrective action as required within the agreed time frame noted on the CAR. The Contractor shall advise the Superintendent upon completion of the corrective action. Comiskey Group 4 18 June 2008 Environmental Management Plan Rev: 1 238401
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.