Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ENVIRONMENTAL MANAGEMENT PLAN Cc ) Cardno PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH ELEMENT C2 —- COMMUNITY AMENITY POLICY: To minimize the impact of construction on the local community. PERFORMANCE No unreasonable disruption to the residential amenity of the local area shall OBJECTIVES: be allowed. If a complaint is received, the cause of the complaint shall be investigated and, so far as it is the Contractor’s responsibility to do so, the cause of the complaint shall be remedied such that there is no cause for further complaint. CONTROL The Contractor should establish an induction program to the satisfaction of the MEASURES: construction Superintendent, to inform all site workers of environmental protection requirements and practices on the site, prior to their commencement on the site. The Contractor shall advise loca! residents (occupants of all residences to be directly affected by the proposed works) of the proposed construction program. The Contractor shall provide means to advise residents and landowners in advance of construction activities that may impact upon them and establish a system to receive complaints and comments from and to seek the cooperation and assistance of the community. The Contractor shall advise Council and the Superintendent when the resident advice process is complete. MONITORING: The Contractor shall maintain records of the Contractor's induction training, and all communications with local residents. REPORTING: The Contractor shall submit monthly reports to the Superintendent, which include records of communications with local residents and full details of any contentious issues and actions taken. All reports and records will be provided to Council upon request. CORRECTIVE Non-conformance with this plan shall be documented and a corrective action ACTION: request (CAR) issued. All CARs shall be included in the Non-conformance Register which will be developer and maintained by the Contractor. Copies of CARs shall be provided to Council upon request. The Contractor shall implement the corrective action as required within the agreed time frame noted on the CAR. The Contractor shall advise the Superintendent upon completion of the corrective action. Comiskey Group 5 18 June 2008 Environmental Management Plan Rev: 1 238401
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.