ENVIRONMENTAL MANAGEMENT PLAN Cc ) Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

ELEMENT C2 —- COMMUNITY AMENITY

POLICY: To minimize the impact of construction on the local community.

PERFORMANCE No unreasonable disruption to the residential amenity of the local area shall
OBJECTIVES: be allowed.

If a complaint is received, the cause of the complaint shall be investigated
and, so far as it is the Contractor’s responsibility to do so, the cause of the
complaint shall be remedied such that there is no cause for further complaint.

CONTROL The Contractor should establish an induction program to the satisfaction of the

MEASURES: construction Superintendent, to inform all site workers of environmental
protection requirements and practices on the site, prior to their
commencement on the site.

The Contractor shall advise loca! residents (occupants of all residences to be
directly affected by the proposed works) of the proposed construction
program. The Contractor shall provide means to advise residents and
landowners in advance of construction activities that may impact upon them
and establish a system to receive complaints and comments from and to seek
the cooperation and assistance of the community.

The Contractor shall advise Council and the Superintendent when the resident
advice process is complete.

MONITORING: The Contractor shall maintain records of the Contractor's induction training,
and all communications with local residents.

REPORTING: The Contractor shall submit monthly reports to the Superintendent, which
include records of communications with local residents and full details of any
contentious issues and actions taken. All reports and records will be provided
to Council upon request.

CORRECTIVE Non-conformance with this plan shall be documented and a corrective action

ACTION: request (CAR) issued. All CARs shall be included in the Non-conformance
Register which will be developer and maintained by the Contractor. Copies of
CARs shall be provided to Council upon request.

The Contractor shall implement the corrective action as required within the
agreed time frame noted on the CAR.

The Contractor shall advise the Superintendent upon completion of the
corrective action.

 

Comiskey Group 5 18 June 2008
Environmental Management Plan Rev: 1 238401

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.