08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ENVIRONMENTAL MANAGEMENT PLAN Ci > Cardno PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH ELEMENT C3 — AIR QUALITY POLICY: To minimize the impact of construction activity on air quality. PERFORMANCE To comply with the Environmental Protection Act, the subordinate OBJECTIVES: Environmental Protection Policy (Air), Council By-Laws and health and safety requirements. If air quality complaints are received by the Contractor or Council from adjacent residents, the Contractor will investigate those complaints. If necessary, air quality contro! measures shall be reviewed and upgraded if appropriate. If a complaint is received concerning dust, the Contractor shall implement bulk air quality monitoring and, if the results of this monitoring exceed limits prescribed in Table C3.1, then necessary action will be undertaken to reduce @ dust emissions from the development site. CONTROL General MEASURES: The Contractor shall establish an Air Quality Control System to the satisfaction of the Superintendent, prior to commencing work, to manage air quality control on the site. The following specific issues will be addressed: Eumes All equipment shall be efficient, operated in accordance with established operating procedures and maintained to minimize exhaust emissions. Engines shall not be left idling needlessly. All vehicles and plant shall be properly maintained so as to ensure that emission levels are less than the limits defined by relevant Commonwealth Department of Transport and Regional Services Federal Office of Road Safety Australian Design Rules: e ADR30 Diesel Engine Exhaust Smoke Emissions @ « ADR36 Exhaust Emission Control for Heavy Duty Vehicles e ADR37 Emission Control for Light Vehicles e ADR70 Exhaust Emission Control for Diesel Engine Vehicles Odours All materials (eg paints) or processes (eg. painting) that generate fumes or odours shall be properly stored and used with efficient equipment to established procedures. Dust Dust control measures shali be used on all processes that generate dust. Windbreak screens shall be employed where considered necessary between working areas and abutting residential areas. Oil must not be used for the suppression of dust. Comiskey Group 6 18 June 2008 Environmental Management Plan Rev: 1 238401
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.