Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056

of 73

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

ENVIRONMENTAL MANAGEMENT PLAN Gq > Cardna

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

MONITORING: The inspection schedule for sediment and erosion control measures is
contained in Table C5.2.

The Contractor shall monitor the works on a weekly basis for evidence of;

e Satisfactory provision and functionality of erosion control measures.
e Signs of erosion, such as gully erosion
e Accumulation of sediment at discharge points

During wet weather, the Contractor shall inspect the site daily to check
sediment traps, and silt fences etc. for damage such as scour, soil erosion,
sediment deposition, by-passing of treatment measures etc.

REPORTING: Monthly reporting by the Contractor to the Superintendent covering all
maintenance activities and corrective actions. All reports and records will be
r provided to Council upon request.

CORRECTIVE Non-conformance with this plan shall be documented and a corrective action

ACTION: request (CAR) issued. All CARs shall be included in the Non-conformance
Register which will be developer and maintained by the Contractor. Copies of
CARs shall be provided to Council upon request.

The Contractor shall implement the corrective action as required within the
agreed time frame noted on the CAR.

The Contractor shall advise the Superintendent upon completion of the
corrective action.

 

Comiskey Group 12 18 June 2008
Environmental Management Plan Rev: 1 238401

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.