Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ENVIRONMENTAL MANAGEMENT PLAN CC Cardno PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH Table C5.1 Erosion and Sediment Control Measures EVENT ACTIVITY Prior to vegetation disturbance | Construction of retardation basins in areas subject to disturbance or earthworks activity Commencement of Instatlation of silt fences using appropriate geotextile mesh or other construction material around any areas likely to be disturbed, to capture all eroded material. Use of other mechanisms such as soil stabilization techniques, to further prevent sediment transport from the site. Construction of low earth bunds around the upstream side of any working area, so as to divert upstream drainage around the site. During vegetation clearing and | Stacking and removal of nominated vegetation. earthworks Stockpiling and stabilization of excavated topsoil and other soil materials to prevent erosion. Maintenance of minimum ground-opened area at any one time. After completion of earthworks | Re-vegetation and stabilization of affected areas, using stockpiled topsoil, so as to prevent erosion and sediment transport. After completion of project Vegetation of overland flow paths and any disturbed areas to eliminate ongoing erosion. Table C5.2 Schedule of Inspection for Erosion and Sediment Control Measures Period Frequency | Location Type Parameters to be Monitored Whilst Weekly All erosion control Visual Check to ensure that erosion control temporary measures measures are in place and are sediment functioning satisfactorily. control measures Retention ponds Visual e Degradation of water quality are in place and treatment « Signs of erosion, such as gulley areas erosion e Accumulation of sediment at discharge points Daily during | All erosion control Visual Check for damage, bypassing, wet weather | measures deposition of excessive silt, scour etc. including sediment traps, silt fences, GPTs etc Comiskey Group 13 18 June 2008 Environmental Management Plan Rev: 1 238401
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.