Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ENVIRONMENTAL MANAGEMENT PLAN Cc Cardno PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH ELEMENT C6 - SITE RESTORATION, REHABILITATION AND WEED CONTROL POLICY: To provide a completed development of pleasing appearance and ecological values with a suitable vegetated surface treatment of all disturbed areas and rehabilitation of weed infested areas. PERFORMANCE To create conditions and implement measures that would ensure the prompt OBJECTIVES: establishment of vegetation that consists primarily of native species, within all areas that have been disturbed as part of the proposed development. Restoration shall be carried out as specified to the satisfaction of the Superintendent and Council. CONTROL The application of mulch, free from contamination by weed species, to all MEASURES: areas of soil that have been cleared as part of the proposed works and that are to be subsequently planted with trees and shrubs. Particular attention shall be paid to exposed soil on steep slopes. Design and implementation of a staged weed control program that forms part of the detailed landscaping and maintenance programs for the site. The weed control program shall ensure that the area of cleared land that has not been rehabilitated shall be minimised at all times. Such an approach shall reduce the impact of weed clearing activities upon fauna habitat resources. Treatment of existing infestations of invasive non-native species using appropriate, species specific means including non-residual herbicides, physical removal of the whole plant, hand pulling of seedlings and cut-stump applications of residual herbicides for woody weeds. Removal of weed infested vegetation and weed stockpiles from all clearance areas. Stockpiled weed infested vegetation shall not be mulched for re-use on site, nor disposed of at a green waste recycling facility due to the fact that such practices facilitate the re-establishment and/or spread of weed species. Of particular note in this respect is the prevalence of weeds such as the Madeira Vine, which are capable of propagation from fragments of stems or leaves. Appropriate disposal methods include disposal at an appropriate landfill facility, pit burning, or other disposal approved of by Council. The prompt and progressive rehabilitation of areas within which infestations of weed species have been treated. Early rehabilitation is required to minimise the risk of subsequent re-establishment of weeds. Such rehabilitation shall involve the planting of native trees, shrubs and under-storey species with the emphasis on species that are local to the area and which are components of ecosystem types that originally occurred in the area. Soil erosion measures shall be implemented as described in the EMP Element for Soil Erosion and Sediment Control, which will reduce the risk of transportation of weed seeds or viable plants from site in surface water runoff. All construction plant shall be cleaned prior to transportation onto the site to prevent the introduction of exotic species. Comiskey Group 14 18 June 2008 Environmental Management Plan Rev: 1 238401
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.