Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056

of 73

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

ENVIRONMENTAL MANAGEMENT PLAN Cc Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

ELEMENT C6 - SITE RESTORATION, REHABILITATION AND WEED CONTROL

POLICY: To provide a completed development of pleasing appearance and ecological
values with a suitable vegetated surface treatment of all disturbed areas and
rehabilitation of weed infested areas.

PERFORMANCE To create conditions and implement measures that would ensure the prompt
OBJECTIVES: establishment of vegetation that consists primarily of native species, within all
areas that have been disturbed as part of the proposed development.

Restoration shall be carried out as specified to the satisfaction of the
Superintendent and Council.

CONTROL The application of mulch, free from contamination by weed species, to all

MEASURES: areas of soil that have been cleared as part of the proposed works and that
are to be subsequently planted with trees and shrubs. Particular attention shall
be paid to exposed soil on steep slopes.

Design and implementation of a staged weed control program that forms part
of the detailed landscaping and maintenance programs for the site. The weed
control program shall ensure that the area of cleared land that has not been
rehabilitated shall be minimised at all times. Such an approach shall reduce
the impact of weed clearing activities upon fauna habitat resources.

Treatment of existing infestations of invasive non-native species using
appropriate, species specific means including non-residual herbicides,
physical removal of the whole plant, hand pulling of seedlings and cut-stump
applications of residual herbicides for woody weeds.

Removal of weed infested vegetation and weed stockpiles from all clearance
areas.

Stockpiled weed infested vegetation shall not be mulched for re-use on site,
nor disposed of at a green waste recycling facility due to the fact that such
practices facilitate the re-establishment and/or spread of weed species. Of
particular note in this respect is the prevalence of weeds such as the Madeira
Vine, which are capable of propagation from fragments of stems or leaves.
Appropriate disposal methods include disposal at an appropriate landfill
facility, pit burning, or other disposal approved of by Council.

The prompt and progressive rehabilitation of areas within which infestations of
weed species have been treated. Early rehabilitation is required to minimise
the risk of subsequent re-establishment of weeds. Such rehabilitation shall
involve the planting of native trees, shrubs and under-storey species with the
emphasis on species that are local to the area and which are components of
ecosystem types that originally occurred in the area.

Soil erosion measures shall be implemented as described in the EMP Element
for Soil Erosion and Sediment Control, which will reduce the risk of
transportation of weed seeds or viable plants from site in surface water runoff.

All construction plant shall be cleaned prior to transportation onto the site to
prevent the introduction of exotic species.

 

Comiskey Group 14 18 June 2008
Environmental Management Plan Rev: 1 238401

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.