Original source · versioned page text
20181085-ASC7 - Part 14 Assessement Criteria (Codes) (1)
Attached to the e-mail Operational Works Application OPW20/0114 - Email 2 of 4 - Civil Plans - Community Titles Scheme Statement - BUP - Part 14 Assessment Benchmarks - 4 Portside Crt, Noosaville.
Attached to the e-mail RE_ Proprietary Products & Compliance with SQUIDEP.eml, inside BP Noosaville - overview of proposed stormwater quality strategy related discussions.msg.
Division 19—Waste Management Code
Including amendments to 8 June 2018
The Noosa Plan
14.151 Waste Management Code
The provisions in this division comprise the Waste Management Code. They are—
compliance with the Waste Management Code (section 14.153);
overall outcomes of the Waste Management Code (section 14.154); and
specific outcomes and probable solutions for the Waste Management Code (section
14.155).
14.152 Compliance with the Waste Management Code
Development that is consistent with the specific outcomes in section 14.155 complies
with the Waste Management Code.
14.153 Overall outcomes for the Waste Management Code
14.153.1 The overall outcomes are the purpose of the Waste Management Code.
14.153.2 The overall outcomes sought for the Waste Management Code are the following—
a) The storage, disposal and management of solid and liquid waste are conducted in an safe
and ecologically sustainable manner and without environmental nuisance;
b) The on-site storage of waste does not create environmental nuisance or visual impact to
adjoining property during the construction of a development; and
c) Council and other licensed trade waste services are able to conveniently collect and dispose
of waste generated by the development.
14.154 Specific outcomes and probable solutions for the Waste
Management Code
The specific outcomes sought for the Waste Management Code are included in column 1
of Table 14-60. Probable solutions for code assessment development are included in
column 2 of Table 14-60.
Table 14-60
column 1 column 2
Specific Outcomes Probable solutions (if code assessment)
Waste separation
O1 Development that generates several S1.1 Construction, operational and demolition
classes of waste is designed so waste is works are planned and managed in accordance
collected, stored and disposed of in a safe and PSP1135;
ecologically sustainable manner 34. AND
S1.2 Adequate area is provided for on-site for
the collection and separate storage of
recyclable, non-recyclable, vegetative and
hazardous materials in their specific waste
streams during construction, operational and
demolition works;
AND
O2 Waste storage areas provide for adequate S2.1 Waste storage areas allow for the
34
Any proposal for the disposal of liquid trade waste to Council’s sewer must be in accordance with Council’s Environmental
Health Section’s Trade Waste Policy.
35
PSP 11 requires Waste Management Plans to be prepared as part of certain types of development applications to ensure
proper consideration is given to waste minimisation, segregation and reuse.
14-157
Waste Management Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.