Original source · versioned page text
20181085-ASC7 - Part 14 Assessement Criteria (Codes) (1)
Attached to the e-mail Operational Works Application OPW20/0114 - Email 2 of 4 - Civil Plans - Community Titles Scheme Statement - BUP - Part 14 Assessment Benchmarks - 4 Portside Crt, Noosaville.
Attached to the e-mail RE_ Proprietary Products & Compliance with SQUIDEP.eml, inside BP Noosaville - overview of proposed stormwater quality strategy related discussions.msg.
column 1 column 2
Including amendments to 8 June 2018
Specific Outcomes Probable solutions (if code assessment)
The Noosa Plan
14.149 Staged development
O15 Staged development is planned, designed No solution provided.
and constructed to ensure that—
a) each stage of the development can be
constructed without interruption to
services and utilities provided to the
previous stages;
b) the infrastructure provided is capable of
servicing the entire development; and
c) the materials used are consistent
throughout the development.
14.150 Alterations to services and utilities
O16 Any alterations or repairs to infrastructure S16.1 Any alterations or repair to infrastructure
as a result of the development are made at no as a result of the development are completed at
cost to Council. the developer’s expense.
14-156
Transport, Roads and Drainage Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.