Original source · versioned page text
Part 14 Codes PIP to LGIP 8 June 2018
Attached to the e-mail Operational Works Application OPW20/0114 - Email 2 of 4 - Civil Plans - Community Titles Scheme Statement - BUP - Part 14 Assessment Benchmarks - 4 Portside Crt, Noosaville.
Attached to the e-mail RE_ Proprietary Products & Compliance with SQUIDEP.eml, inside BP Noosaville - overview of proposed stormwater quality strategy related discussions.msg.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
column 1 column 2
Including amendments 8 June 2018
Specific Outcomes Probable solutions (if code assessment)
The Noosa Plan
filtration strips and gross pollutant traps, are used
wherever possible.
O8 Development design including density and S8.1 Integration of stormwater quality
scale provides adequate footprint to integrate all treatment is in accordance Healthy
elements of stormwater quality and quantity Waterways Water Sensitive Urban Design
treatment infrastructure including, where relevant, Guidelines for South East Queensland and
bio retention basin batters and maintenance the Water by Design Bio retention Technical
access, without the need for retaining walls. Design Guideline.
O9 Stormwater conveyance channels use natural S9.1 Landscape and ecological features
channel design principles to convey external (e.g. plant species and habitat types) used
catchment stormwater through the development in stormwater conveyance channels are
site and support landscape, passive recreation and complementary to the local context,
ecological values. including natural waterways;
AND
S9.2 Planting densities result in a stable
channel over the long term and minimize
potential for invasive weed growth.
O10 Development design and operation facilitates S10.1 Methods to prevent gross pollutants
nil increase in gross pollutants entering stormwater entering stormwater systems and waterways
systems. are adopted that—
a) are low maintenance;
b) prevent nutrient leaching in the event
scheduled maintenance is delayed;
and
c) facilitate human behaviour change
(e.g. signage, bins).
14-162
Watercourses Works Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.