Part 14 Codes PIP to LGIP 8 June 2018

Attached to the e-mail Operational Works Application OPW20/0114 - Email 2 of 4 - Civil Plans - Community Titles Scheme Statement - BUP - Part 14 Assessment Benchmarks - 4 Portside Crt, Noosaville.

Attached to the e-mail RE_ Proprietary Products & Compliance with SQUIDEP.eml, inside BP Noosaville - overview of proposed stormwater quality strategy related discussions.msg.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                    column 1                                            column 2




                                                                                                                         Including amendments to 8 June 2018
                Specific Outcomes                       Probable solutions (if code assessment)




                                                                                                        The Noosa Plan
                                                        By Design Guidelines;
                                                        AND

                                                        S1.3 Commitments are made to implement
                                                        a cost effective maintenance strategy for the
                                                        life cycle of any engineered water quality
                                                        treatment device;
                                                        AND

                                                        S1.4 Water quality nutrient load modelling is
                                                        undertaken in accordance with Water by
                                                        Design Music Modelling Guidelines to
                                                        demonstrate compliance with the SPP
                                                        nutrient reduction requirements;
                                                        AND

                                                        S1.5 Stormwater outlets that directly
                                                        discharge to naturally acidic environments
                                                        are managed to prevent eutrophication;
                                                        AND

                                                        S1.6 Suitable methods are incorporated to
                                                        prevent the spread of invasive
                                                        environmental weed species at stormwater
                                                        outlets.
Water demand
O2 Urban development reduces the need for               S2.1 Captured water is plumbed to be
mains water by capturing and utilising run-off from     available for all external uses including
appropriate areas on site.                              gardening, irrigation, ponds and outdoor
                                                        cleaning.

O3 Urban development reduces the need for               S3.1 Planting is in accordance with PSP 3
mains water by eliminating requirement for irrigation   Landscaping Plans and Guidelines.
via the use the endemic plant landscaping design.

O4 Backflow devices or similar systems are              S4.1 A suitable backflow prevention device
installed, where necessary, to ensure water reuse       is installed to protect the drinking water
facilities have no impact on the quality of the town    within the reticulated water supply in
mains water.                                            accordance with AS/NZS 3500:2003
                                                        Plumbing and Drainage.

Shire Business Centre
O5 Within the Shire Business Centre site, as            No probable solution
shown on Map SBC run-off treatment is contained
within the developable areas of the site and
drainage lines are only used for final polishing of
run-off;
AND

O6 Within the Shire Business Centre site, as
shown on Map SBC, on-site detention measures
are contained within the developable areas of the
site, clear of drainage lines and Open Space
Precincts.
Use of natural treatments and systems
O7 Natural treatment strategies, including grass        S7.1 No probable solution
swales and bio-retention systems, vegetated


                                                14-161
                                        Watercourses Works Code
Log in to download the original file

Part 14 Codes PIP to LGIP 8 June 2018.pdf · 3.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗