column 1 column 2
Including amendments to 8 June 2018
Specific Outcomes Probable solutions (if code assessment)
The Noosa Plan
By Design Guidelines;
AND
S1.3 Commitments are made to implement
a cost effective maintenance strategy for the
life cycle of any engineered water quality
treatment device;
AND
S1.4 Water quality nutrient load modelling is
undertaken in accordance with Water by
Design Music Modelling Guidelines to
demonstrate compliance with the SPP
nutrient reduction requirements;
AND
S1.5 Stormwater outlets that directly
discharge to naturally acidic environments
are managed to prevent eutrophication;
AND
S1.6 Suitable methods are incorporated to
prevent the spread of invasive
environmental weed species at stormwater
outlets.
Water demand
O2 Urban development reduces the need for S2.1 Captured water is plumbed to be
mains water by capturing and utilising run-off from available for all external uses including
appropriate areas on site. gardening, irrigation, ponds and outdoor
cleaning.
O3 Urban development reduces the need for S3.1 Planting is in accordance with PSP 3
mains water by eliminating requirement for irrigation Landscaping Plans and Guidelines.
via the use the endemic plant landscaping design.
O4 Backflow devices or similar systems are S4.1 A suitable backflow prevention device
installed, where necessary, to ensure water reuse is installed to protect the drinking water
facilities have no impact on the quality of the town within the reticulated water supply in
mains water. accordance with AS/NZS 3500:2003
Plumbing and Drainage.
Shire Business Centre
O5 Within the Shire Business Centre site, as No probable solution
shown on Map SBC run-off treatment is contained
within the developable areas of the site and
drainage lines are only used for final polishing of
run-off;
AND
O6 Within the Shire Business Centre site, as
shown on Map SBC, on-site detention measures
are contained within the developable areas of the
site, clear of drainage lines and Open Space
Precincts.
Use of natural treatments and systems
O7 Natural treatment strategies, including grass S7.1 No probable solution
swales and bio-retention systems, vegetated
14-161
Watercourses Works Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.