Skip to the record
Search everything, all in one place.

Original source · versioned page text

Part 14 Codes PIP to LGIP 8 June 2018

Attached to the e-mail Operational Works Application OPW20/0114 - Email 2 of 4 - Civil Plans - Community Titles Scheme Statement - BUP - Part 14 Assessment Benchmarks - 4 Portside Crt, Noosaville.

Attached to the e-mail RE_ Proprietary Products & Compliance with SQUIDEP.eml, inside BP Noosaville - overview of proposed stormwater quality strategy related discussions.msg.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                        column 1                                        column 2
                 Including amendments 8 June 2018




                                                    Specific Outcomes                  Probable solutions (if code assessment)
The Noosa Plan




                                                                                    revetment wall;
                                                                                    AND
                                                                                    S12.4 The seep holes in the revetment wall are
                                                                                    not obstructed by any jetty;
                                                                                    AND
                                                                                    S12.5 For lots comprising detached houses or
                                                                                    duplex dwellings, a maximum of one jetty per
                                                                                    development is constructed;
                                                                                    AND
                                                                                    S12.6 Unit developments with common property
                                                                                    along canal frontage met the following—
                                                                                    a) a maximum of 2 jetties per unit
                                                                                        development;
                                                                                    b) jetties are shared between unit owners;
                                                                                    c) a minimum of 20m separation is provided
                                                                                        between each jetty;
                                                                                    d) the jetty is setback a minimum of 3m from
                                                                                        the prolongation of boundaries; and
                                                                                    e) jetty heads and pontoons are not
                                                                                        constructed (Refer Figure 14-37);
                                                                                    Figure 14-37




                                                                                    AND
                                                                                    S12.7 For unit developments where each unit
                                                                                    has its own individual canal frontage—
                                                                                    a) a joint application with the adjoining owner
                                                                                        is made (Council is unlikely to support a
                                                                                        jetty application for the exclusive use of one
                                                                                        unit owner); and
                                                                                    b) Jetties are constructed as follows—
                                                                                       i)       the jetty is shared between two unit
                                                                                                owners;
                                                                                       ii)      the jetty straddles the common
                                                                                                boundary of the two units;
                                                                                       iii)     jetty heads and pontoons are not
                                                                                                constructed; and
                                                                                       iv)      fencing between the two properties
                                                                                                is setback a minimum 1m from the
                                                                                                revetment wall to allow for efficient
                                                                                                access to the jetty by both owners
                                                                                                (Refer Figure 14-38);




                                                                                14-170
                                                                        Watercourses Works Code
Log in to download the original file

Part 14 Codes PIP to LGIP 8 June 2018.pdf · 3.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.