Part 14 Codes PIP to LGIP 8 June 2018
Attached to the e-mail Operational Works Application OPW20/0114 - Email 2 of 4 - Civil Plans - Community Titles Scheme Statement - BUP - Part 14 Assessment Benchmarks - 4 Portside Crt, Noosaville.
Attached to the e-mail RE_ Proprietary Products & Compliance with SQUIDEP.eml, inside BP Noosaville - overview of proposed stormwater quality strategy related discussions.msg.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
column 1 column 2
Including amendments 8 June 2018
The Noosa Plan
Specific Outcomes Probable solutions (if code assessment)
services— OR
a) meets the needs of users; S16.2 For lots elsewhere—power supply and
b) ensures health, safety and convenience of communications infrastructure are provided
the community; underground unless—
c) protects the natural environmental values
of the site and surrounds, including visual a) located in the Rural Zone or Rural
amenity and native vegetation; Settlement Zone and where not in a
d) are cost effective over their life cycle; Bushfire Hazard Area as defined on
e) minimises adverse impacts to the Overlay Maps OM1.4-OM9.4;
environment (including the amenity of the b) new low voltage lines can be strung from
local area) in the short and long term; and poles carrying existing high voltage lines;
f) ensures that the existing systems are or
upgraded or relocated to be capable of c) no extensions to the existing reticulation
supporting the proposed development; network is necessary; or
d) it is necessary to cross a body of water;
AND
S16.3 Street lighting is provided in accordance
with Section 3.19 of PSP5 Engineering Design
Standards – Roads, Drainage and Earthworks;
AND
S16.4 For lots not within a sewerage service
area—the lot has sufficient area and other
attributes to ensure sustainable on-site sewerage
disposal39;
Editor’s note:
PSP24 – Effluent Disposal details requirements for the
design and siting of effluent disposal systems where
located outside a sewerage service area. Compliance
with PSP24 will be considered as part of Council’s
assessment of the plumbing and drainage application.
S17.1 Components of the essential network
infrastructure that are likely to fail or may result in
contamination when inundated by flood water—
O17 Essential network infrastructure (e.g. a) comply with Table 13.12; or
electricity, water supply, sewerage and b) are designed and constructed to exclude
telecommunications) maintains effective water inundation or infiltration and resist
function during and immediately after flood hydrostatic and hydrodynamic forces as a
events. result of inundation.
39
PSP1 details information Council may request including an effluent disposal report.
14-182
Reconfiguring a Lot Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.