The Noosa Plan
Specific Outcomes Probable solutions (if code assessment)
Electricity supply infrastructure
O18 Uses and works maintain a safe distance S18.1 Building footprints are situated clear of
from electrical infrastructure including any power easements on-site;
substations, overhead power lines, power poles
and transformers. AND
S18.2 Building footprints are not less than 50m
from an existing fenced electricity substation.
14.190 Earthworks and stormwater management40
O19 Stormwater run-off is managed so as not No solution provided
to cause any adverse impacts on the built or
natural environment including changes in
quality, quantity or location of stormwater
discharges.
O20 Filling or excavation only occurs where it No prescribed solution.
does not adversely impact on—
a) watercourses, drainage lines and
wetlands; or
b) vegetation on land identified on
Biodiversity Overlay Maps OM1.1-OM9.1;
or
c) water levels on properties elsewhere.
14.191 Landscaping and visual amenity
O21 Land development responds to the S21.1 The natural landform and landscape are
distinctive landscape character of the site by not modified to accommodate the development.
utilising the natural features of the site, which
include—
a) watercourses and drainage lines;
b) significant trees;
c) understorey vegetation;
d) rock outcrops; and
e) views.
O22 Native vegetation, including individual S22.1 Buffers of existing native vegetation
mature trees are retained, protected, maintained around site boundaries and environmentally
and supplemented, with particular consideration sensitive areas are retained and reinforced
given to— through additional planting;
a) roadsides; AND
b) the amenity of adjoining land uses; and
c) the protection of environmentally sensitive S22.2 For reconfiguring in the Rural Zone and
areas. Rural Settlement Zone—
a) a 10m landscaped buffer area is provided
along road frontages;
b) clearing and disturbance to vegetation is
40
PSP1 identifies information that may be requested by Council including Stormwater Management Plans and Stormwater
Master Plans,
14-183
Reconfiguring a Lot Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.