Table 14-16 Industrial Business Type 3 Extractive
Including amendments to 8 June 2018
The Noosa Plan
Column 1 column 2
Specific Outcomes Probable solutions (if code assessment)
14.26 Effects of Use
Buffers, Separation and Amenity No Solution Provided
O87 The extractive industry is adequately
separated from sensitive uses to minimise potential
for nuisance or complaint.
O88 The design, operation and staging of the
extractive industry promotes the efficient utilisation
of the resource.
O89 The design, operation and staging of the
extractive industry mitigates vibration, noise, dust,
lighting and other impacts on the surrounding area.
O90 The design, operation and staging of the
extractive industry reduces impacts on natural
environmental values to the greatest extent
reasonably practicable and where impacts cannot
be avoided the loss or decrease in values is
minimised or offset.
O91 The design, operation and staging of
extractive industry optimises potential alternative
land uses after the cessation of extractive activities.
O92 The design, operation and staging of the
extractive industry has regard to the desired visual
character of the locality.
14-30
Business Uses Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.