Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

20181085-ASC7 - Part 14 Assessement Criteria (Codes) (1)

Attached to the e-mail Operational Works Application OPW20/0114 - Email 2 of 4 - Civil Plans - Community Titles Scheme Statement - BUP - Part 14 Assessment Benchmarks - 4 Portside Crt, Noosaville.

Attached to the e-mail RE_ Proprietary Products & Compliance with SQUIDEP.eml, inside BP Noosaville - overview of proposed stormwater quality strategy related discussions.msg.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                     Column 1                                             column 2




                                                                                                                    Including amendments to 8 June 2018
                Specific Outcomes                        Probable solutions (if code assessment)




                                                                                                   The Noosa Plan
Management of Operations                                 No Solution Provided
O93 On-site drainage is designed, constructed and
maintained to:
a)   minimise erosion;
b)   avoid pollution of groundwater and surface
     water;
c)   provide opportunities to conserve and reuse
     water on the site; and
d)   prevent additional flooding or inundation.

O94 Noise, vibration and dust emissions from the
development are managed to acceptable levels.

O95 Operations minimise lighting impacts on roads
and other properties

O96 Public access to the site is managed
appropriately

O97 Development is designed in a manner which
will not compromise the stability, safety or operation
of infrastructure.

O98 Development is designed and managed to
minimise the risk and impact of any accidental spills
and / or releases of chemicals and other materials
that may contaminate soil, stormwater, groundwater
and/or air.

Landscaping                                              No Solution Provided
O99 Landscaping complements biodiversity values
of the adjoining area.

Hours of Operation                                       No solution provided
O100 Extractive industry activities occurs at times
that will not result in disturbance at surrounding
uses.

Traffic and Transport
O101 The transportation of materials is undertaken
in a way which:
a)    maintains the safety and efficiency of the
      roads comprising the transport route; and
b)    minimises amenity impacts on premises
      within the transport routes separation area.




                                                  14-31
                                           Business Uses Code
Log in to download the original file

20181085-ASC7 - Part 14 Assessement Criteria (Codes) (1).pdf · 3.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.