Original source · versioned page text
20181085-ASC7 - Part 14 Assessement Criteria (Codes) (1)
Attached to the e-mail Operational Works Application OPW20/0114 - Email 2 of 4 - Civil Plans - Community Titles Scheme Statement - BUP - Part 14 Assessment Benchmarks - 4 Portside Crt, Noosaville.
Attached to the e-mail RE_ Proprietary Products & Compliance with SQUIDEP.eml, inside BP Noosaville - overview of proposed stormwater quality strategy related discussions.msg.
Column 1 column 2
Including amendments to 8 June 2018
Specific Outcomes Probable solutions (if code assessment)
The Noosa Plan
Rehabilitation No solution provided
O102 Rehabilitation of the site, over the life of the
project and on its completion:
a) provides for progressive/ staged rehabilitation
works;
b) includes appropriate clean-up works (taking
particular account of areas of possible soil or
water contamination);
c) results in a stable final landform;
d) provide suitable drainage and hydraulic
conditions; and
e) achieves a suitable degree of revegetation
consistent with potential post-extraction land
uses.
O103 Rehabilitation allows for suitable use of any
water storage created through the extraction
process, having regard to water quality, hydraulic
conditions, land form and vegetation.
O104 Resource extraction activities in proximity to No solution provided
the Noosa River system only occur where—
a) there is a clear demonstrated need;
b) no feasible and prudent alternatives are
available; and
c) it can be demonstrated that the intrinsic
natural values and resources of the river
system can be managed and protected in an
ecologically sustainable manner.
O105 Industrial business Type 3 Extractive uses No solution provided
are designed, located and operated to ensure—
a) haulage routes associated with extractive
resources—
i are located on roads where the haulage
route will minimise adverse impacts on
residential and urban residential
amenity;
ii are located on roads which are of
adequate construction and which may
be upgraded as part of the utilisation of
the extractive resource; and
iii are adequately maintained as a part of
the utilisation of the extractive resource;
and
b) the utilisation of any extractive resource does
not result in adverse visual impacts from major
roads; and
c) the rehabilitation of extractive industry sites,
prior to or in conjunction with land use changes
on the site of the resources or within buffers to
the resource.
14-32
Business Uses Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.