Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

EngSWMP

Attached to the e-mail Response to Information Request MCU16/0079 (email 2 of 3).

of 94

Page text read automatically using OCR, there may be inaccuracies

Enviropod Installation Procedure – 1 Piece Cage
Strut Installation
    1. Measure the internal dimensions of the pit while marking the center of the pit length, at 150mm down
       from entry of pit (the height where the struts are to be secured).
       Remember to allow for dimension “A”.




    2. Using a unit template mark the position of the holes for the L-brackets, based on the center mark.




    3. Using an 8mm masonry drill bit drill holes for the insertion of the Dyna Bolts.




©2013 Stormwater360 | EnviroPod Installation Manual                                                         4

Log in to download the original (EngSWMP.PDF)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.