Original source · versioned page text
EngSWMP
Attached to the e-mail Response to Information Request MCU16/0079 (email 2 of 3).
4. Cut the T sections to length, and pop rivet an L-bracket to one end of the T sections.
5. Insert the T section, with L-bracket under the lintel and secure L-bracket to the pit wall with an 8mm
Galvanised Dyna Bolt.
6. Secure second L-bracket to the opposite pit wall using a Dyna Bolt.
7. Pop rivet the free side of the T section to the second L-bracket.
8. Repeat the steps 5-7 for the second T section.
©2013 Stormwater360 | EnviroPod Installation Manual 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (EngSWMP.PDF)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.