Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

EngSWMP

Attached to the e-mail Response to Information Request MCU16/0079 (email 2 of 3).

of 94

Page text read automatically using OCR, there may be inaccuracies

    4. Cut the T sections to length, and pop rivet an L-bracket to one end of the T sections.




    5. Insert the T section, with L-bracket under the lintel and secure L-bracket to the pit wall with an 8mm
       Galvanised Dyna Bolt.




    6. Secure second L-bracket to the opposite pit wall using a Dyna Bolt.

    7. Pop rivet the free side of the T section to the second L-bracket.

    8. Repeat the steps 5-7 for the second T section.




©2013 Stormwater360 | EnviroPod Installation Manual                                                             5

Log in to download the original (EngSWMP.PDF)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.