Original source · versioned page text
EngSWMP
Attached to the e-mail Response to Information Request MCU16/0079 (email 2 of 3).
Top Section Installation
1. Measure the internal dimensions of the pit at the height at which the plastic is to sit.
2. Trim the plastic to fit the internal pit dimensions, adding an extra 20mm to each side to ensure a tight
fit.
3. With the plastic bent slightly upwards, lower the Top Section into the pit, guiding the unit so that it
locates on the T Sections struts.
©2013 Stormwater360 | EnviroPod Installation Manual 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (EngSWMP.PDF)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.