Original source · versioned page text
EngSWMP
Attached to the e-mail Response to Information Request MCU16/0079 (email 2 of 3).
4. Slide the Top Section along the T Sections until it sits in the center of the pit.
5. Check unit to ensure a good fit with pit, if the unit does not make a good fit, and that any gaps are less
than 15mm. If the gaps are larger than 15mm the plastic will need to be replaced by a larger section.
6. On each strut drill a 5mm hole through the Top Section and the T Struts, and secure the Top Section to
the struts using a 73AS6-8 pop rivet. NOTE: if the EnviroPod incorporates a cage, step 6 can be
completed during stage 2 of “Cage Installation”.
7. Check plastic to ensure that it is bent upwards on all sides, adjusting plastic if required, fill small gaps
with silicon sealant if required.
©2013 Stormwater360 | EnviroPod Installation Manual 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (EngSWMP.PDF)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.