GENERAL COMMITTEE MEETING AGENDA 26 APRIL 2016
The average duration of time lost due to injury is very high compared to other like Councils.
It was slightly lower than the equivalent time last year but is significantly above like sized
Councils. This is reflective of an older workforce where injuries can sometimes take longer
to recover.
Our WH&S scheme rate is increasing but is still lower than other Councils in category D
(similar Councils to Noosa Council). The best performing Council in that category has a
scheme rate of 0.905% while the worst is 2.083%. Our scheme rate increased from
1.242% in to 1.366% (as a percentage of total wages). Based on our current performance,
it is likely to increase again next year.
Personal leave taken is continuing to be monitored closely and has shown significant
improvement over the last 12 months. It has, however, spiked up in the last 2 months and
will be monitored closely in coming months. We normally see an increase during winter
months but February was abnormally high.
We measure annual leave by focusing on “Accrued Annual Leave Weeks (median)” but we
also monitor the number of staff who have excess (over 8 weeks) annual leave weeks
accumulated. We have made a concerted effort to reduce the number of staff with over 8
weeks annual leave. There are 23 staff with more than 8 weeks of annual leave (down
from 31 in September and 25 in January) reflecting some work areas where there has been
high workloads over the last 2 years.
Our staff turnover rate remains very low compared to other Councils.
Our Customers
The total number of customer requests received by Council remains on a slight upward
trend in the long term with slightly more customer requests per month in February than at
the corresponding time last year. In fact, the number of requests in February was the
highest we have seen in nearly 2 years.
The level of sign off of completed CRMs (customer request management system) is
improving. More work has been done at the management level in “drilling down” within the
overall statistics to ensure that completed request are “signed off”. In many instances,
tasks are being completed but not signed off in the system. The level of customer
complaints remains relatively low.
The average wait time for our customers when phoning Council continues to improve over
time and our month to month performance is better than last year. This quarter included a
rates period which always leads to extra enquiries. Our frontline customer service staff
continue to provide an excellent “front face” to our community.
Customer indicators for processing times for various types of development applications
have remained relatively constant over the 3 month period. The most problematical
applications (MCUs) continue to take the most time.
The average time to process plumbing applications has risen over the last 12 months but is
still significantly better than the statutory deadlines. This rise reflects the additional work
undertaken by the plumbers to service Council facilities such as public toilets and beach
showers.
Our Finances
Our financial KPIs measure solvency, investment performance and outstanding rates. All
of these KPIs continue to be on track.
Council receives a financial performance report at the end of each month which provides a
more detailed analysis of Council’s financial position. Council receives a detailed report on
capital works progress every 3 months.
Page 9 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.