GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Program Funding Comments Amount Funding
Source
REPA – Recovery Cash advance to assist Council. The $1,000,000 DRFA
funding actual costs need to be acquitted against
the MARS application due 30 September
2022
REPA – Clean-up $30,000,000 DRFA
funding (Share across
nominated
LGAs)
REPA Cat B Reconstruction works to recover essential Estimated DRFA
assets to prior standard. The list is still in $20,000,000 -
progress, but the latest listing can be $30,000,000
found in the Appendix.
QRA are aware of this value and are
encouraging the consultant and
Council to continue work towards
submission.
REPA Cat D Work that improves resilience to the Yet to be DRFA
community. determined
Funding has not yet been approved
but funding has been made available
in every other prior disaster.
Consultant Fees Erscon Engineering Consultants to lead Not to exceed DRFA
Council activities related to reconstruction, $2,000,000
resilience, and betterment.
Consultant Submission Erscon Engineering Consultants to lead Not to exceed Council
Preparation Council submission and acquittal of cost $100,000
recovery for reconstruction, resilience, and
betterment.
Estimated Budget required to be funded by Council $100,000
Note that the Consultant Submission Preparation is the only element that the DRFA will not
fund. However, this activity is a key attribute for Council to ensure maximum opportunity to
recover cost of reconstruction, resilience and betterment. Having the consultant undertake
this work based on their prior experience and knowledge of approved projects with QRA
increases this opportunity. The $100,000 represents good value on the following basis:
a. A cost of $100,000 to recover this cost represents a value for money outcome for
Council as it equates to only 0.03% - 0.05% of the total estimated cost of $20,000,000
- $30,000,00.
b. Erscon are experienced at working using acceptable methods that ensure actions that
crossover between submission work and investigation are suitably allocated.
Example includes where Erscon are investigating a site and possible plan, they will
take necessary photos to help develop the scope (cost recoverable from DRFA).
These photos are then required for the submission but as they were sourced during
investigation they are reused and therefore are not allocated to preparation cost, saving
contribution towards the $100,000 Council expense.
As this is resulting from a disaster, there was no budget allocated to fund this engineer project
management work.
Page 10 of 96
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.