GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
All scope above is recoverable using the DRFA, except the QRA submission preparation.
The consultant has offered a capped fee of $100,000 to execute this work and it will be
costed based on the approved rate card and actual hours.
The contract is based on a schedule of rates methodology and only actual work and
authorised expenses will be invoiced. This is a typical contract methodology for works such
as these. The sites are still in identification phase and each site has varying treatment plans
of varying cost. This is supported by the DRFA process where QRA approve Council project
budget based on an estimated value (EV) and then require reporting monthly to track
variances through to the final acquittal stage in September 2024.
The reconstruction project consists of the following stages:
Stage Description Timing Status Forecast Cost to Date
Cost
Counter Disaster Establishing and Feb 2022 – 65% n/a $123,052.50
Operations and leading execution of Sept 2022
Emergency Works protocols to improve
recovery of costs
Urgent action for Coordination of April 2022 – 50% Not to
high value, high necessary June 2022 exceed
risk sites (HVHR) engineering $180,000
assessment for sites
such as Black
Mountain Rd
landslip
REPA – Cat B/D Planning, Design April 2022 – 0% Not to For Approval
Planning & Design and costing in Mar 2023 exceed
preparation of $2,000,000
submission to QRA
Reconstruction All necessary work June 2022 – 0% For Approval
work to return/improve June 2024
asset to standard
QRA Submission Data collation and May 2022 – 0% $100,000 For Approval
preparation lodgement of June 2024
application
Total to Date to not exceed $303,052.50*
Total for this request $2,100,000
*Engagement of Erscon for the Emergency component of works was also under Section 234 of the LG Regulation
2012.
2. Budget
The majority of this project will be funded by the DRFA. The table below outlines what
DRFA has funded to date as well as forecast funding.
Program Funding Comments Amount Funding
Source
Disaster operations and Cash advance to assist Council cash flow $1,000,000 DRFA
Emergency works for the. This needs to be acquitted against
the MARS application due 30 September
2022
Page 9 of 96
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.