GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Completely avoiding disturbance to intertidal vegetation (mangroves and saltmarshes)
and minimising impacts to seabed vegetation including seagrass beds and
macroalgae;
Buffering of mangroves, including pneumatophores by 2m and seagrass beds by 10m;
Providing for ongoing public access to the foreshore, including at the proposed load-
out site at Noosaville;
Allowing for the safe passage of vessels at all tides through careful consideration of
gaps between restored reef habitats;
Engineering rock substrates in accordance with applicable standards, assured by an
RPEQ;
Buffering existing tidal works (e.g. jetties) by at least 30m;
Generally improving the stability of the seabed at the restoration sites, and monitoring
changes to the seabed and banks to ensure potential impacts are detected and
managed;
Using construction materials which are clearly compatible with the marine environment;
and
Minimisation and monitoring of seabed sediment disturbance as a result of the
proposed works.
The application material includes a range of environmental management and monitoring
commitments, primarily documented in the Noosa Oyster Ecosystem Restoration Project -
Project Restoration Plan. These measures should be consolidated in a Construction
Environmental Management Plan (CEMP).
Consultation
External Consultation - Community & Stakeholder
Since February 2020, the project team has met face-to-face with over 70 Noosa stakeholder
groups and including local recreational and active commercial fishers, tourism and
recreational groups and Noosa Council approved indigenous representatives to discuss the
project and to present the proposed restoration sites. The overwhelming feedback from these
meetings was supportive.
The Project also requires referral to the State Assessment and Referral Agency (SARA)
given that the following State referral triggers under the Planning Regulation 2017 are
relevant:
- Part 6 – Declared Fish Habitat Area and Marine Plants
- Part 17 – Tidal Works or Works in a Coastal Management District
The applicant referred the application to SARA on 10 February 2022 and subsequently SARA
approved the application (subject to conditions) on 7 April 2022. The SARA conditions
primarily relate to (but are not limited to) the following matters:
- ensuring works are undertaken in accordance with approved design drawings and
relevant engineering and environmental standards
- ensuring relevant notifications to State agencies are completed
- ensuring appropriate signage, navigation markers and work boundary markers are
deployed
- ensuring that any impacts to MSES (marine plants) are temporary and are restored
upon completion of works
- development and implementation of an Inspection and Monitoring program
Page 48 of 96
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.