2020-03-16 GC Agenda - Item 4 - Attachment 1 - MCU18 0015 Officers Report and attachments from 2019-06-11 P&E Agenda

of 84

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (21.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    11 JUNE 2019


The applicant submits that the proposed detached houses and multiple dwelling units are located
on areas that have limited ecological significance with the balance of the site proposed to be
rehabilitated. An overall approach to managing slope stability is to have a ‘non-worsening’ impact
on slope stability with specialist recommendations provided in the application regarding dwelling
and driveway footings, earthworks and drainage.
A combined development footprint for the 14 dwelling units and structures, including the
driveway, amounts to an area of 0.57ha. The applicant considers the development footprint has
been aligned to the least constrained parts of the land and the site can be safely and responsibly
developed.
The application includes an Environmental Connectivity Plan (refer to Figure 4) which identifies a
wildlife corridor to be maintained through the site, connecting with existing tracts of vegetation
surrounding the site and the national park.




                              Figure 4: Environmental Connectivity Plan

The Reconfiguration of a Lot (1 into 4 lots plus Access Easement) component of the
development is described as follows:
   Lot 1 – 7,507m² (to contain 12 detached Multiple Housing Units and environmental
     covenant over the balance of the lot). 3 significant Hoop Pines within this lots are
     specifically proposed to be retained. ;
   Lot 2 – 1,050m² (contains a nominated building envelope for 1 detached house and
     environmental covenant over the balance of the lot);
   Lot 3 – 950m² (contains a nominated building envelope for 1 detached house and
     environmental covenant over the balance of the lot).
   This lot is proposed to utilise the benefit of the following easements on the adjoining
     property to the east, being Peppers Resort:
     o     Easement L SP207304 for access; and
     o     Easements M and P on SP207304 for bin storage.
     The easements have effect upon approval and commencement of the use. There is
     currently no permitted access to Lot 3 from Peppers Resort for construction purposes
     under the current easement.

                                                                                  Page 66 of 133
Log in to download the original file

2020-03-16 GC Agenda - Item 4 - Attachment 1 - MCU18 0015 Officers Report and attachments from 2019-06-11 P&E Agenda(PDF, 20MB).pdf · 21.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.