The applicant has requested existing condition 11h be amended and replaced with the following
amended condition:
11. An updated Construction/Traffic Management Plan and Traffic Guidance Scheme must be
submitted to Council for agreement prior to the pre-start meeting and must specifically
address the following:
h. Include a post out to the local residents and businesses, including all the residents
along the haulage route from the Serenity Close cul-de-sac up to Reef-Eenie Creek
Grant Street/Noosa Drive roundabout advising of the proposed development
including the expected time frames and the site contact details.
Assessment of Request
The applicant has requested condition 11h be amended to be consistent with the requested change
to 11c.
While Engineering recommends the extent of dilapidation reporting remains as originally
conditioned, Engineering is generally supportive of this request due to the establishment of the
information and reporting website required as part of condition 11g but recommends the post out
conclude at the Leslie/Noosa Drive roundabout rather than the Grant Street/Noosa Drive
roundabout.
Local residents and businesses west of the Lesie/Noosa Drive roundabout will be able to access
the information and reporting website which achieves the intent of original condition.
Recommendation
It is recommended existing condition 11h be amended to read as follows:
11. An updated Construction/Traffic Management Plan and Traffic Guidance Scheme must be
submitted to Council for agreement prior to the pre-start meeting and must specifically
address the following:
h. Include a post out to the local residents and businesses, including all the residents
along the haulage route from the Serenity Close cul-de-sac up to Reef-Eenie Creek
the Leslie/Noosa Drive bridge roundabout advising of the proposed development
including the expected time frames and the site contact details.
Existing Condition 13
13. Prior to the commencement of municipal works associated with this development, Council
requires the provision of a bank guarantee, or a cash bond, of not less than 10% (minimum
of $5000) of the value of the municipal works.
Applicant’s Request
The applicant has requested existing condition 13 be deleted due to an existing performance bond
imposed under condition 28 of the higher order approval (132008.176.05).
Assessment of Request
Consistent with Engineering’s assessment of the requested removal of condition 5, the municipal
works bond strictly relates to the municipal works (i.e., works to be Council owned) and does not
form any part of the higher order approval, nor the Operational Works compliance bond.
This bond secures the performance of the asset and provides a financial incentive for any
rectification works to occur during the maintenance period. Council will not accept works as On
Maintenance without a municipal works bond (aka, ‘Maintenance Bond’).
Recommendation
It is recommended existing condition 13 remain unchanged.
Page 5 of 7
Document Set ID: 24109099
Version: 6, Version Date: 25/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Negotiated Report (Representations made) OPW25 0042 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 142 KB (small file)
- File type
No other editions are linked here.