Original source · versioned page text
2016-07-18 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 18 JULY 2016
66. Wetlands, bioretention basins and other water quality treatment devices shall
be designed and constructed in accordance with Healthy Waterways Water
Sensitive Urban Design – Technical Guidelines for South East Queensland
2006, Water by Design Bioretention Technical Design Guidelines 2014, Healthy
Waterways Water by Design Construction and Establishment Guidelines:
Swales, Bioretention Systems and Wetlands February 2009. In the case of any
inconsistencies between these documents, the most recent document shall
prevail.
67. Stormwater treatment strategy must be designed and maintained to achieve
compliance with the approved version of B14158.W.07L.AMcP.ag.docx dated 8
October for the Stormwater Management Construction and Maintenance Plan
Framework.
68. The detailed Stormwater Management Construction and Maintenance Plan
(SMCMP) must be designed and implemented in accordance with the
framework detailed in the approved version of B14158.W.07L.AMcP.ag.docx
dated 8 October and approved by the Council prior to issue of operational
works approval:
69. The owner of the development is responsible for all costs associated with the
construction and ongoing maintenance and repair of the treatment of
stormwater on the site and for all catchments that enter the site.
70. The Operational Works Application must include calculations in accordance
with the Queensland Urban Drainage Manual to demonstrate that the
confluence of stormwater at the drainage easement will not cause scour and
that any required dissipater/erosion control can be contained wholly within the
applicant’s property.
71. Any waters captured on site must be plumbed to be available for all external
uses including gardening, irrigation, filling swimming pools and outdoor
cleaning, as well as all ground floor toilet cisterns and washing machine cold
taps.
72. Operational Works Application must demonstrate that the peak 1-year ARI
event discharge off site is limited to the pre-development peak 1-year ARI event
discharge flow.
73. Prior to commencement of use, the applicant must provide Council with a
performance bond to the value of 150% of the value of monitoring and
maintenance of the water bodies for the first 5 years of full operation. The
bonds shall be incrementally released annually following completion of the
development and upon demonstration to the satisfaction of Council Officers that
all aspects of the approved version of the detailed Stormwater Management
Construction and Maintenance Plan required by this approval have been
implemented to effectively prevent or reduce likelihood of cyanobacteria
outbreaks for the site for the preceding year.
Water & Sewer Connections
74. An underground connection to reticulated water and sewerage must be
provided to the development site in accordance with the standards and
requirements of Northern SEQ Distributor–Retailer Authority (Unitywater).
Page 12 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.