2016-07-18 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 18 JULY 2016
75. A Certificate of Completion from the Northern SEQ Distributor–Retailer
Authority (Unitywater) must be submitted to Council that certifies an
underground connection to reticulated water and sewerage has been provided
to the development site.
Power Supply
76. An underground electricity service shall be provided to the site if not already
provided. In this regard, an approved ENERGEX Electrical Design Consultant
shall work in conjunction with Council’s Manager - Works Support to prepare
detailed designs of the electrical proposal.
The detailed designs shall then be submitted to ENERGEX for approval and a
copy of their approval submitted to Council in conjunction with a “Certificate of
Electricity Supply for Proposed Subdivisions” (prepared by an approved
ENERGEX Electrical Design Consultant) prior to Council endorsing the Plan of
Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design
Consultant shall be wholly at the applicant’s expense and shall not entail a
financial encumbrance on future purchasers of the proposed lots.
77. The requirements of ENERGEX shall be satisfied in relation to any existing
services traversing the site. Written confirmation by ENERGEX that satisfactory
arrangements have been made to formalise any required easements and/or
existing informal services shall be submitted prior to Council endorsing the Plan
of Survey.
78. Streets lighting and pathways lighting throughout the development site must be
provided in accordance with Australian Standards.
79. Street lighting shall be provided along Pearsons Road frontage of the site in
accordance with Australian standards.
Telecommunication
80. The requirements for TELECOMMUNICATION services shall be satisfied in
relation to the provision of new telephone services to the developed site. In this
regard written confirmation from an approved telecommunication agency shall
be submitted to the Council prior to Council endorsing the Plan of Survey.
Erosion and Sediment Control
81. Any person acting on this permit shall prevent erosion and sediment export
from leaving the site. Site control measures such as silt fencing, controlled
gravel access to the site and controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment
are required to be submitted to the Council for approval prior to obtaining a
Development Permit for Operational Works.
General
82. A suitably qualified Registered Professional Engineer shall prepare engineering
drawings and specifications for all engineering works that will become Council
infrastructure, which shall be submitted in conjunction with an application for a
Development Permit for Operational Works. In this regard a DXF/DWG file on
GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in
conjunction with any application for Operational Works.
Page 13 of 19