Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Approved Document Construction & Tree Management Plan OPW25-0206 · OPW25/0206

of 40

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (10.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
          Establish Site Access Routes:
              The project team are to establish controlled access routes into the site for material deliveries as well as
                  contractors and sub-contractor vehicles.
              The creation of dedicated and delineated access pathways for the construction equipment and materials
                  are to be established and mulched 200-300mm in depth to protect the ground from compaction where
                  suitable. On completion of the project, the mulch can be carefully spread by hand and used within the
                  landscaping. Physical surface treatments including track mats and suspended platforms are to be laid over
                  areas where surface roots are exposed and likely to be impacted pre-construction. Additional protection
                  measures, including ground and trunk protection are to be used where deemed necessary as the project
                  progresses.
              Boardwalk “corridors” will be utilized as construction access circulation routes to minimize ground
                  disturbance and protect sensitive areas.
              Temporary Construction and Ground Protection Zones have been identified adjacent to the cabins – refer
                  to ATTACHMENT D – these are to facilitate temporary access and scaffolding for cabin construction
                  works.

          Clearing of Cabin Footprint:
               With guidance from the project arborist, the contractor, and the project manager, the site will be pegged-
                  out and the cabin locations set up.
               Grading and leveling the site to achieve the desired elevations and slopes will be carried out while
                  minimizing soil disturbance and erosion. The cabins will be designed to ensure that the requirement for
                  minimal site leveling in minimal.
               Temporary fencing and signage will be erected to delineate the construction site and protect the
                  surrounding environment, as outlined in earlier sections Site Readiness and Site Set-up and Preparation.


5.6 CONSTRUCTION
5.1.       Construction Sequencing:
To facilitate minimal impact to the site during construction works, a staged approach is to be adopted for construction
sequencing of the overall cabin works. By separating the construction into smaller components, it is envisaged the use of
reduced construction teams and construction machinery. Some of the cabin sites/footprints can be used as working areas
for set-down and circulation.

          Stage 1 Construction (Cabins 2 to 9) – Refer ATTACHMENT D
               Site preparation – as per the pre-construction stages outlined in earlier sections - Site Readiness and Site
                 Set-up and Preparation.
               The cabin construction sequencing will follow the methodology outlined in the next section Cabin
                 Construction Methodology.
               Stage 1 will focus on the construction of the contractors site facilities and Cabins 2&3, 4&5, 6&7, 8&9.
               Construction will centre on cabin earthworks, foundations, structural framing, roofing and cladding, with
                 some works to the cabin services.
               Throughout the construction process, regular monitoring and adjustments will be made to ensure
                 compliance with the Tree Management Plan and environmental guidelines as previously identified and
                 detailed.



Construction and Tree Management Plan - REV03                                                                Page 5 of 45

Used in these records

About this file

File size
10.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Document Construction & Tree Management Plan OPW25-0206.pdf · 10.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.