          Stage 2 Construction (Cabins 1, 10 &11, 12-15) – Refer ATTACHMENT D
               Following the completion of Stage 1, construction will shift to Stage 2.
               Stage 2 includes: Cabins 1, 10 & 11, 12 & 13, 14 & 15. This stage will also include the completion of the
                 boardwalks and interior fit outs for the Stage 1 cabins.
               This phase will involve similar steps as Stage 1, including earthworks, foundations, structural framing,
                 roofing and cladding, plus the addition of interior fit-outs, services and boardwalk construction.
               Throughout the construction process, regular monitoring and adjustments will be made to ensure
                 compliance and the tree protection measures and environmental guidelines as previously identified and
                 detailed.

          Stage 3 Construction (Carpark and Boardwalks) – Refer ATTACHMENT D
               Following the completion of Stage 1 & Stage 2, construction will shift to Stage 3
               Stage 3 includes:
                 o Boardwalks to the remaining cabins, car parking and access routes.
                 o Removal of Temporary utilities and the connection of permanent services to the council systems.
                 o Final Commissioning of all cabins and handover procedures.
               This phase will also include the demobilisation of construction site facilities and site
                 rectification/rehabilitation - as detailed in the section Post Construction.



5.2.       Cabin Construction Methodology:

          General Earthworks and Excavation:
              Excavation will be limited to the necessary extent, focusing on areas where foundation elements are to be
                 placed.
              In sensitive areas, hand excavation will be used to minimize soil disturbance and root damage. Where
                 mechanical excavation is required, low-impact machinery will be used, and ground protection measures
                 will be implemented.
              Refer to ATTACHMENT C - Work Methodologies Adjacent Trees for detailed information on:
                 o General Excavation Methodologies
                 o Post Hole Dig Works Methodology
              Excavated soil will be stockpiled in designated areas, away from sensitive vegetation and watercourses.
                 Whenever feasible, excavated soil will be reused on-site to minimize the need for imported fill. Soil
                 stabilization techniques will be implemented to prevent erosion and promote vegetation growth.
              Effective stormwater management measures, such as silt fences, sediment traps, and swales, will be
                 implemented to control runoff and prevent sedimentation.
              Regular monitoring of water quality will be conducted to ensure compliance with environmental
                 regulations.

          Foundations:
              As part of the project design process, a light touch on the ground is the intention, which has driven the
                construction methodology and the proposed cabin designs.
              It is proposed that a prefabricated steel support sub-frame on pier foundations (either bored piers or screw
                piers, whichever is deemed the least invasive at each location required) be used to construct the cabins
                within a few meters of retained trees without overly compromising the tree root systems or the ground in

Construction and Tree Management Plan - REV03                                                               Page 55 of 45

Used in these records

About this file

File size
10.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Document Construction & Tree Management Plan OPW25-0206.pdf · 10.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.