which they are growing. A lightweight Post and Rail structural prefabricated steel framework allows for the
location of the foundations to move in two directions along the frame, allowing for flexibility on site and the
ability to adapt to any tree root systems. This method is used extensively in modular construction. The
structural engineer will work closely with the architect and the arborist to establish the foundation system
most suitable at each location.
Refer to ATTACHMENT C for detailed information on footing excavation methodologies.
Concrete works to footings will be carried out with a strong focus on environmental sustainability and
minimizing impact on the site's sensitive ecosystems. Environmental Sustainability can be achieved by
several methods including:
o A reduced water-cement ratio subject to structural engineering requirements.
o Supplementary Cementitious Materials (SCMs) could be incorporated to reduce the amount of
cement required and improve concrete properties; and
o Recycled concrete aggregates can be used to reduce the demand for natural aggregates and
minimize waste.
Concrete will be pumped to the cabin footings from the main site laydown areas. This will minimize the
number of concrete trucks, reducing noise and emissions. Low impact curing methods, such as water
curing or membrane curing, can be used to conserve water and reduce environmental impact.
To protect fauna and flora, strict measures are to be implemented by the main contractor to prevent
concrete spills and leaks.
Regular cleaning of equipment and work areas will be required to minimize the risk of concrete
contamination.
Buffer zones are to be established by the Project Arborist and Contractor around sensitive vegetation to
protect it from concrete splashes and spills.
Erosion and sediment control measures will be required to prevent concrete-laden runoff from entering
water bodies.
Structural Framework:
The intention is to use lightweight prefabricated structural steel framing that will be assembled on site – a
Post and Rail structural prefabricated framework.
Steel framing can be designed and manufactured in set lengths, allowing for easier site delivery and
flexibility for installation in restricted spaces.
Temporary scaffolding and small construction equipment may be required for this initial steel erection.
This can be carefully planned and monitored as required per cabin build.
The final structural methodology will be worked up by a qualified structural engineer during the detail
design stage. Continual collaboration with the architects and arborist will ensure a fit-for-purpose outcome
that responds to all site constraints and requirements.
Cladding and Roofing:
To minimize the environmental impact during roofing and cladding works, a modular construction
approach, where feasible, will be employed. Prefabricated panels can be manufactured off-site and
transported to the site using smaller, less disruptive vehicles.
Bushfire requirements will be required to be factored into the final roofing and cladding construction
methodologies in accordance with the approved Bushfire Management and Mitigation Plan and to be
considered under the Development Permit for Building Works.
Manual handling will be prioritized to reduce site disruption, noise pollution and vibration.
Construction and Tree Management Plan - REV03 Page 54 of 45
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Document Construction & Tree Management Plan OPW25-0206.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.