Capital Works Schedule
As at: 31-Mar-2016
% of Annual
Project Original Current Future Year To Date Remaining Budget Spent
Code Project Number - Description Budget Budget Budget Actual Commitments (Actuals) Project Manger
Bridges
500003 500003 - Noosaville - Munna Point Bridge Stage 2 1,627,005 3,136,779 3,136,779 1,804,515 779,[email protected]% Mr Adam Britton
500500 500500 - Cooroy Mary River Road Timber Bridge Rehabilitation 50,000 172,500 172,500 10,613 08 6.15% Mr Cameron Shields
500501 500501 - Cooroy, Cooroy- Belli Creek Road Timber Bridge deck resurfac 10,000 10,000 10,000 1,094 08 10.94% Mr Cameron Shields
500502 500502 - Whole of Shire Annual Level 3 Bridge inspection program 2016 30,000 30,000 30,000 9,898 09 32.99% Mr Cameron Shields
500503 500503 - Whole of Shire Bridge replacement program - Planning and des 200,000 200,000 200,000 256 08 0.13% Mr Adam Britton
Total Bridges 1,917,005 3,549,279 3,549,279 1,826,376 779,148 51.46%
Coastal Canals and Waterways
100721 100721 - Gympie Terrace and William Street Revetment wall and pathway 0 0 2,643 169,[email protected]% Mr Dallas Bickley
500004 500004 - Noosaville - Gympie Tce / Williams St 222,585 222,585 39,857 08 17.91% Mr Dallas Bickley
500071 500071 - Noosa Waters - scour protection stage 2b 0 0 713 09 0.00% Mr Adam Britton
500109 500109 - Munna Point Foreshore Stabilisation 49,028 49,028 40,830 08 83.28% Mr David Shing
500504 500504 - Noosa Heads Ravenswood Park Public Jetty Rehabilitation 35,000 59,000 59,000 52,767 0” 89.43% Mr David Shing
500505 500505 - Tewantin Doonella Street Public Jetty Rehabilitation 28,000 53,921 53,921 50,069 0G 92.86% Mr David Shing
500506 500506 - Sunshine Beach - Beach Access 30 45,000 45,000 45,000 27,597 08 61.33% Mr David Shing
500507 500507 - Sunrise Beach - Beach Access 34 Replace stairs adjacent road 50,000 50,000 50,000 22,253 08 44.51% Mr David Shing
500508 500508 - Castaways Beach - Beach Access 42 70,000 76,000 76,000 76,252 08 100.33% Mr David Shing
500509 500509 - Noosaville Noosa Waters - navigational lock renewals 13,000 13,000 13,000 8,496 2,[email protected]% Mr David Shing
500510 500510 - Noosa Heads Main Beach - Sand pumping pipe replacement progr 50,000 50,000 50,000 39,989 09 79.98% Mr David Shing
500612 500598 - Munna Pnt Foreshore Rehab Stg 2 Design Drawings and Approval 27,500 27,500 0 08 0.00% Mr David Shing
Total Coastal Canals and Waterways 291,000 646,034 646,034 361,466 172,572 55.95%
Commerical Land and & Property
500207 500207 - Rufous St Design & Development Phase 300,000 313,167 313,167 132,131 38,[email protected]% Mr Fox Rogers
500511 500511 - Sunrise Beach Shopping Centre Refurbishment 60,000 60,000 60,000 11,134 08 18.56% 8 Mr Clint Irwin
Total Commerical Land and & Property 360,000 373,167 373,167 143,265 38,127 38.39%
Community Facilities
100726 100726 - Peregian Surf Club Public Amenities - Planning & Design 12,777 12,777 0 09 0.00% Mr Clint Irwin
500011 500011 - Mill Place Boiler House - stage 2 97,300 97,300 681 09 0.70% Ms Kerri Contini
500014 500014 - Noosa Library and NLC Plumbing 15,000 15,000 0 08 0.00% Ms Kerri Contini
500016 500016 - Whole of Shire - community light poles 70,440 70,440 10,300 08 14.62% Mr Clint Irwin
500021 500021 - Noosa Respite Centre - internal refurb 238,866 238,866 227,914 08 95.42% Mr Greg Tucker
500072 500072 - Noosa Heads - lifeguard storage survey 0 0 453 08 0.00% Mr Clint Irwin
500073 500073 - Tait Duke House - relocation 58,084 58,084 54,626 500 9 94.05% Mr Martin Sergas
500110 500110 - Tewantin Spray Park Shade Sail 40,000 40,000 2,501 08 6.25% Mr Dallas Bickley
500208 500208 - NAC 25m pool Retile and Regrout 59,300 59,300 59,300 08 100.00% Mr Stephen James
500512 500512 - Sunshine Beach NAC - Hydraulics Report 50mtr pool filtration 10,000 10,000 10,000 3,500 08 35.00% Ms Emma ONeill
500513 500513 - Cooroy Library - Roof drainage repair and replacement 11,500 11,500 11,500 10,280 0G 89.39% Ms Kerri Contini
500514 500514 - Sunshine Beach NAC - Regrout & recaulk of the Program Pool 30,000 30,000 30,000 0 08 0.00% Ms Emma ONeill
500515 500515 - Noosa Heads Surf Club Public Amentities Refurbishment 85,000 0 0 0 08 0.00% Mr Clint Irwin
500516 500516 - Sunshine Beach NAC - Replacement of Program Pool heat pump 55,000 100,000 100,000 156 119,[email protected]% Ms Emma ONeill
500538 500538 - NLC - Stage 2 Construction of redesigned reception area 45,000 45,000 45,000 2,855 08 6.34% Ms Emma ONeill
500539 500539 - Noosa Heads Demolition of Lifeguard Service/ SLSQ operations 21,000 21,000 21,000 08 0.00% Ms Emma ONeill
500609 500595 - Noosa Leisure Centre Fire Indicator Brd 6,642 6,642 6,039 0” 90.92% Ms Cathy Simon
500616 500602 - Sunshine Beach - Solar Bollard Replacement Trial 10,000 10,000 09 0.00% Mr Bryan OConnor
500617 500603 - Noosa Leisure Centre and The J - Evac Centre Switchboards 25,800 25,800 08 0.00% Mr Fox Rogers
500620 500606 - Respite Centre / Shed 25,000 25,000 11,020 08 44.08% Mr Greg Tucker
500621 500607 - Replacement of Condensor units at The J 65,000 65,000 64,102 0” 98.62% Mr Allan Hazell
500637 500623 - NAC Replacement of Fridge and Freezer 0 0 11,042 On) 0.00% Mr Stephen James
500638 500624 - Multiple Sites - Supply and Installation of PFC Controller 0 0 42,680 rn) 0.00% @ Mr Phill Parkman
Total Community Facilities 257,500 941,709 941,709 507,449 119,850 53.89%
Page 20 of 29See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.